ANALISIS WAKTU DAN PRODUKTIVITAS ALAT BERAT PADA PENGURUGAN LAPANGAN SERBA GUNA DESA BARINGIN A, KABUPATEN TAPIN

Saputra, Imam (2022) ANALISIS WAKTU DAN PRODUKTIVITAS ALAT BERAT PADA PENGURUGAN LAPANGAN SERBA GUNA DESA BARINGIN A, KABUPATEN TAPIN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Artikel Imam.pdf

Download (232kB)

Abstract

Pemilihan alat berat yang akan digunakan merupakan faktor penting dalam keberhasilan suatu proyek kostruksi. Alat berat yang dipilih harus tepat sehingga proyek/pekerjaan berjalan lancar. Tugas akhir ini memiliki pokok pembahasan, yaitu untuk mengetahui produktivitas alat berat, jumlah alat berat dan waktu pelaksanaan pekerjaan. Penelitian ini dibatasi pada masalah produktivitas alat berat yang berkaitan dari kombinasi alat barat excavator Komatsu PC200-8, dan dump truck Mitsubishi 120 Ps, Adapun Produktivitas excavator didapat sebesar 44,64 m3/jam dengan membutuhkan alat sebanyak 1 unit excavator. Produktivitas dump truck tujuan pembuangan Lokasi Desa Baringin A dengan jarak 5,5 km adalah sebesar 53,44 m3/jam dengan menggunakan 7 (tujuh) unit dump truck. Selection of heavy equipment to be used is an important factor in the success of a construction project. The selected machine must be precise so that the project / work runs smoothly. This final task has a subject of discussion, namely to find out the productivity of heavy equipment, the number of heavy equipment and the time of implementation of work. This research was limited to the problem of machine productivity related to the combination of western tools komatsu PC200-8 excavator, and mitsubishi dump truck 120 Ps, while excavator productivity was obtained by 44.64 m3 / hour by requiring a tool as much as 1 excavator unit. The productivity of dump truck destinations baringin A village location with a distance of 5.5 km is 53.44 m3 / hour using 7 (seven) dump truck units.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: excavator, dump truck, produktivitas
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Imam Saputera
Date Deposited: 10 Mar 2022 04:10
Last Modified: 10 Mar 2022 04:10
URI: http://eprints.uniska-bjm.ac.id/id/eprint/10039

Actions (login required)

View Item View Item