TINJAUAN ULANG SISTEM PLUMBING AIR BERSIH DAN AIR KOTOR PADA PEMBANGUNAN GEDUNG PELAYANAN BPKB DITLANTAS POLDA KALSEL

Rachman, Nanda Aulia (2022) TINJAUAN ULANG SISTEM PLUMBING AIR BERSIH DAN AIR KOTOR PADA PEMBANGUNAN GEDUNG PELAYANAN BPKB DITLANTAS POLDA KALSEL. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
LEMBAR KEASLIAN SKRIPSI.pdf

Download (182kB)
[img] Text
LEMBAR PENGESAHAN SKRIPSI.pdf

Download (250kB)
[img] Text
ARTIKEL NANDA AULIA RACHMAN .pdf

Download (412kB)

Abstract

Dalam pembangunan sebuah gedung diperlukan suatu perencanaan dalam hal struktur, arsitektur dan Mekanikal Elektrikal dan Plumbing. Bangunan gedung membutuhkan sistem sanitasi. Sistem yang dimaksud adalah tercukupinya kebutuhan air bersih dan air kotor yang harus tersedia pada gedung. Pada Landasan Ulin, Kecamatan Lianganggang, Kota Banjarbaru, Kalimantan Selatan, terdapat pembangunan Gedung Pelayanan BPKB Ditlantas Polda Kalsel. Gedung tersebut memiliki dua lantai, dimana lantai pertama merupakan pusat pelayanan, dan lantai ke-dua merupakan tempat perkantoran dimana pegawai disana bekerja. Perencanaan sistem plumbing diharapkan sesuai dengan fungsi gedung dan peraturan yang berlaku. Besar debit air yang digunakan pada pembangunan gedung Pelayanan BPKB Ditlantas Polda Kalsel sebesar 1234. Dimensi pipa air bersih yang diperoleh 1,5”,1,25”,1”,2”,0,5” inch. Dimensi pipa air kotor yang diperoleh 2”, 3”, 4” inch. In the construction of a building required a plan in terms of structure, architecture and Mechanical, Electrical and Plumbing. Buildings need a sanitation system. The system in question is the sufficiency of clean water and dirty water that must be available in the building. On the Ulin Platform, Linganggang District, Banjarbaru City, South Kalimantan, there is the construction of the BPKB Service Building of the South Kalimantan Police Ditlantas. The building has two floors, where the first floor is a service center, and the second floor is an office space where employees work there. Plumbing system planning is expected to be in accordance with building functions and applicable regulations. The amount of water used in the construction of the BPKB Service building at the South Kalimantan Police Ditlantas is 1234. The dimensions of the clean water pipe obtained are 1.5”,1,25”,1”,2”,0.5” inch. The dimensions of the dirty water pipe obtained are 2”, 3”, 4” inch.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Gedung, Pipa Air Bersih, Pipa Air Kotor. Building, Clean Water Pipes, Dirty Water Pipes.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Hartinah
Date Deposited: 02 Dec 2022 02:05
Last Modified: 02 Dec 2022 02:05
URI: http://eprints.uniska-bjm.ac.id/id/eprint/13408

Actions (login required)

View Item View Item