ANALISIS WAKTU DAN BIAYA PRODUKTIVITAS ALAT BERAT PADA PROYEK REHABILITASI JALAN PALAM – LIANG ANGGANG

Mulyadi, Budi Rahmad (2023) ANALISIS WAKTU DAN BIAYA PRODUKTIVITAS ALAT BERAT PADA PROYEK REHABILITASI JALAN PALAM – LIANG ANGGANG. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Pernyataan Keaslian skripsi Budi.pdf

Download (278kB)
[img] Text
Lembar pengesahan Budi.pdf

Download (484kB)
[img] Text
ARTIKEL BUDI RAHMAD_removed.pdf

Download (327kB)

Abstract

Usaha perbaikan jalan di wilayah kota Banjarbaru saat ini tetap ditingkatkan, terutama di jalan Palam – Liang Anggang, dikarenakan pada daerah Palam – Liangg Anggang adalah salah satu akses jalan yang cukup penting terutama untuk mobil truk yang bermuatan besar sehingga diperlukan peningkatan yang optimal agar dapat memberikan kenyamanan bagi pengendara yang melalui jalur tersebut. Total waktu produktifitas yang dibutuhkan untuk pelaksanaan rehabilitas jalan sebesar 66.290,649 m3/hari total ini ialah hasil gabungan dari keseluruhan pada item pekerjaan yang ada. Sedangkan lamanya hari dari masing – masing pekerjaan tentunya berbeda –beda, dan penggunaan waktu paling lama digunakan pada alat berat Wheel Loader dengan pekerjaan Laston Lapis Asbuton (AC – WC Asb) 26 hari lamanya. Hal ini tentunya berpengaruh terhadap biaya yang terjadi di lapangan menyesuaikan voleme perhitungan efektifitas. Besaran total keseluruhan dari semua item pekerjaan yang ada, biaya ini tentunya diperlukan pada rehabilitasi jalan sebesar Rp.785.270.870,05 Kata Kunci: Proyek Kontruksi, Produktivitas Waktu dan Biaya, Rehabilitasi Jalan Road repair efforts in the Banjarbaru city area are currently still being improved, especially on the Palam - Liang Anggang road, because the Palam - Liangg Anggang area is one of the most important road accesses, especially for trucks with large loads so that optimal improvements are needed in order to provide comfort for motorists who pass through this route. The total productivity time required for the implementation of road rehabilitation is 66,290.649 m3/day, this total is the combined result of all the existing work items. While the length of days for each job is of course different, and the longest time is used on heavy equipment Wheel Loaders with Laston Lapis Asbuton (AC – WC Asb) work for 26 days. This of course affects the costs incurred in the field adjusting the volume of effectiveness calculations. The total amount of all existing work items, this cost is of course required for road rehabilitation of Rp.785.270.870.05

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Proyek Kontruksi, Produktivitas Waktu dan Biaya, Rehabilitasi Jalan Construction Project, Time and Cost Productivity, Road Rehabilitation
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
Depositing User: Budi Rahmad Muliyadi
Date Deposited: 12 May 2023 02:03
Last Modified: 12 May 2023 02:03
URI: http://eprints.uniska-bjm.ac.id/id/eprint/16261

Actions (login required)

View Item View Item