ANALISIS LIFE CYCLE COST PADA PEMBANGUNAN KANTOR BADAN KEUANGAN DAERAH KOTA BANJARMASIN

MAULIYADI, AKHMAD HARDIAN (2023) ANALISIS LIFE CYCLE COST PADA PEMBANGUNAN KANTOR BADAN KEUANGAN DAERAH KOTA BANJARMASIN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Lembar Pengesahan (2).pdf

Download (288kB)
[img] Text
Lembar Pernyataan.pdf

Download (141kB)
[img] Text
abstrak dan daftar pustaka.pdf

Download (165kB)

Abstract

Life Cycle Cost (LCC) Yakni biaya yang dibutuhkan oleh suatu bangunan selama umur rencananya. Yang termasuk biaya ini yaitu biaya perencanaan dan pembangunan yang dinamakan biaya awal, serta biaya perawatan rutin dan perbaikan yang dinamakan biaya pemeliharaan. Tujuan penulisan skripsi ini yaitu menghitung Life Cycle Cost aktual yang berdasar pada bahan bangunan yang dipakai pada saat pembangunan proyek. Dalam hal ini, bangunan yang ditinjau yaitu bangunan Kantor Badan Keuangan Daerah Kota Banjarmasin, dan bagian bangunan yang dihitung life cycle cost-nya yaitu dinding, lantai, plafond, pintu, jendela dan aksesorisnya, serta elektrikal bangunan kantor tersebut. Melalui proses perhitungan memakai dasar Life Cycle Cost (LCC) pada proyek Kantor Badan Keuangan Daerah Kota Banjarmasin, untuk item pekerjaan dinding, lantai, plafond, pintu, jendela dan aksesoris, serta elektrikal maka didapat biaya total sebesar Rp.2.656.225.047. Dengan biaya yang terdiri dari : Biaya awal Rp.790.772.000, biaya pemeliharaan dinding Rp.1.284.552.938, biaya pemeliharaan lantai Rp.9.245.575, biaya pemeliharaan plafond Rp.179.924.209, biaya pemeliharaan pintu, jendela dan aksesorisnya Rp.144.980.810, biaya pemeliharaan dinding Rp.246.799.514. Life Cycle Cost (LCC) It is the cost required by a building during its design life. Included in these costs are planning and construction costs, known as initial costs, and routine maintenance and repair costs, known as maintenance costs. The purpose of writing this thesis is to calculate the actual Life Cycle Cost based on the building materials used during project construction. In this case, the building being reviewed is the Banjarmasin City Regional Finance Office building, and the part of the building whose life cycle cost is calculated are walls, floors, ceilings, doors, windows and accessories, as well as the electricals of the office building. Through the calculation process using the basic Life Cycle Cost (LCC) in the Banjarmasin City Regional Finance Office project, for wall, floor, ceiling, door, window and accessories work items, as well as electrical, the total cost is Rp.2,656,225,047. With costs consisting of: initial cost Rp.790.772.000, wall maintenance costs Rp.1.284.552.938, floor maintenance costs Rp.9.245.575, ceiling maintenance costs Rp.179.924209, maintenance costs for doors, windows and accessories Rp. 144,980,810, the cost of maintaining the walls is Rp. 246,799,514.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Life Cycle Cost, Pemeliharaan
Subjects: Q Science > Q Science (General)
Depositing User: Akhmad Hardian Mauliyadi
Date Deposited: 20 Nov 2023 05:21
Last Modified: 20 Nov 2023 05:21
URI: http://eprints.uniska-bjm.ac.id/id/eprint/18380

Actions (login required)

View Item View Item