ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMASANGAN KAYU GALAM DAN PEMASANGAN BATU GUNUNG DENGAN METODE TIME STUDY PADA PROYEK PENINGKATAN TANGGUL SUNGAI PULANTAN SEGMEN II (PAKET 4)

Rahmadi, Ahmad (2023) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMASANGAN KAYU GALAM DAN PEMASANGAN BATU GUNUNG DENGAN METODE TIME STUDY PADA PROYEK PENINGKATAN TANGGUL SUNGAI PULANTAN SEGMEN II (PAKET 4). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Pengesahan Rahmadi.pdf

Download (132kB)
[img] Text
Keaslian Rahmadi.pdf

Download (109kB)
[img] Text
Abstrak Ahmad Rahmadi.pdf

Download (13kB)

Abstract

Dalam proyek konstruksi, pada umumnya berkembang dengan baik. Banyak pembangunan khususnya pembangunan irigasi dan pemabangunan lainnya. Dalam proyek konstruksi produktivitas merupakan salah satu factor dapat mempengaruhi keberhasilannya suatu proyek Tenaga kerja proyek kostruksi dituntut untuk bekerja secara relatif, efisien, dan diharapkan bekerja sesuai dengan rencana yang telah dibuat oleh kontraktor. Untuk mengetahui produktivitas pekerja baik secara individu maupun kelompok pada pekerjaan pemasangan batu (tanggul) irigasi maka sangat penting untuk melakukan perhitungan dan analisa produktivitas pekerja. Produktivitas pekerja adalah nilai yang hanya dapat terlihat melalui suatu proses perhitungan tidak bisa secara langsung, maka dilakukan perhitungan nilai produktivitas pekerja dari suatu studi kasus proyek. Hasil perhitungan nilai rata-rata pekerjaan pemancangan kayu galam adalah 54 pcr/hari atau 163 m/hari, sedangkan untuk hasil produktivitas pekerjaan pemasangan baru gunung didapat nilai rata-rata 0,90 m3/orang/hari. In construction projects, it is generally well developed. Many developments, especially irrigation development and other developments. In construction projects, productivity is one of the factors that can influence the success of a project. Construction project workers are required to work relatively, efficiently, and are expected to work according to plans made by the contractor. In order to know the productivity of workers both individually and in groups in the work of installing stones (embankments) for irrigation, it is very important to carry out calculations and analyzes of worker productivity. Worker productivity is a value that can only be seen through a calculation process and cannot be done directly, so the value of worker productivity is calculated from a project case study. The results of the calculation of the average value of the piling work of galam wood is 54 pcr/day or 163 m3/day, while for the productivity results of the new mountain installation work the average value is 0.90 m3/person/day.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Produktivitas, Time Study, Tanggul Irigasi
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Ahmad Rahmadi
Date Deposited: 27 Feb 2024 05:41
Last Modified: 27 Feb 2024 05:41
URI: http://eprints.uniska-bjm.ac.id/id/eprint/18512

Actions (login required)

View Item View Item