PENERAPAN BUILDING INFORMATION MODELING (BIM) DALAM ANALISIS STRUKTUR ATAS DAN ESTIMASI VOLUME PEKERJAAN PADA GEDUNG BERTINGKAT (Studi Kasus : Gedung Rumah Susun BBPJN XI/PJN I Kalimantan)

Maulana, Muhammad Luthfi (2024) PENERAPAN BUILDING INFORMATION MODELING (BIM) DALAM ANALISIS STRUKTUR ATAS DAN ESTIMASI VOLUME PEKERJAAN PADA GEDUNG BERTINGKAT (Studi Kasus : Gedung Rumah Susun BBPJN XI/PJN I Kalimantan). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Keaslian M.Luthfi.pdf

Download (102kB)
[img] Text
Pengesahan M.Luthfi.pdf

Download (110kB)
[img] Text
MuhammadLuthfiMaulana_19640146_JurnalRepository.pdf

Download (223kB)

Abstract

Bangunan Gedung Rumah Susun BBPJN XI/PJN I Kalimantan terdiri dari 9 lantai dengan material beton bertulang. Penelitian ini bermaksud untuk mengeksplorasi penerapan Building Information Modeling (BIM) dalam analisis struktur atas serta estimasi volume pekerjaan pada gedung bertingkat, karena dianggap memiliki fitur-fitur yang dapat diandalkan untuk perencanaan dan meminimalisir kesalahan dalam estimasi volume pekerjaan. Penelitian ini memanfaatkan Tekla Structural Designer dan Tekla Structures, salah satu perangkat lunak BIM yang terkemuka dalam industri konstruksi, sebagai alat untuk memodelkan struktur gedung bertingkat secara detail. Dalam metode ini, analisis struktural dilakukan untuk memastikan kekuatan dan kestabilan struktur menggunakan metode elemen hingga dengan acuan desain SNI 1727-2020 dan SNI 2847-2019. Sedangkan, fitur-fitur Tekla Structures, seperti organizer, digunakan untuk menghitung volume pekerjaan yang dibutuhkan untuk masing-masing komponen struktural. Berdasarkan hasil perhitungan kombinasi pembebanan didapat nilai gaya aksial terbesar terdapat pada kolom K58 (Kode C24-1) sebesar 4910,6 kN, kemudian untuk gaya momen terbesar ada pada balok B57 (Kode 9B6) sebesar 291,8 kNm, dan untuk nilai gaya geser terbesar terdapat balok B46 (Kode 9B6-3) sebesar -237,9/225,1kN. Sehingga hasil dari analisis struktur atas melalui Tekla Structural Designer 2022 diketahui pekerjaan struktural kolom dan balok seluruhnya aman. Adapun hasil estimasi volume pekerjaan pada beton serta besi kolom berturut-turut sebesar 517,8 m3 dan 260.281 Kg, selanjutnya, untuk volume pekerjaan beton serta besi balok berturut-turut sebesar 290,7 m3 dan 90.720 Kg. The BBPJN XI/PJN I Kalimantan Flats Building consists of 9 floors with reinforced concrete material. This study intends to explore the application of Building Information Modeling (BIM) in superstructure analysis and estimation of work volume in multi-storey buildings, because they are considered to have reliable features for planning and minimize errors in estimating work volume.This research utilizes Tekla Structural Designer and Tekla Structures, one of the leading BIM software in the construction industry, as tools to model multi-storey building structures in detail. In this method, structural analysis is carried out to ensure the strength and stability of the structure using the finite element method with design references to SNI 1727-2020 and SNI 2847-2019. Meanwhile, Tekla Structures features, such as the organizer, are used to calculate the volume of work required for each structural component.Based on the results of the loading combination settlement, the largest axial force value is found in column K58 (Code C24-1) of 4910.6 kN, then for the largest moment force is in beam B57 (Code 9B6) of 291.8 kNm, and for the shear force value the largest is beam B46 (Code 9B6-3) of -237.9/225.1kN. So that the results of the superstructure analysis using the Tekla Structural Designer 2022 show that the structural work of the columns and beams is completely safe. The estimated work volume for concrete and iron columns is 517.8 m3 and 260,281 Kg, respectively, then for concrete and iron beam work volumes are 290.7 m3 and 90,720 Kg respectively.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Analisis Struktural, Estimasi Volume Pekerjaan, BIM, Tekla Structural Designer 2022, Tekla Structures 2022.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Luthfi Maulana
Date Deposited: 05 Mar 2024 05:39
Last Modified: 05 Mar 2024 05:39
URI: http://eprints.uniska-bjm.ac.id/id/eprint/20596

Actions (login required)

View Item View Item