HELDIANOOR, HELDIANOOR (2026) ANALISIS KESELAMATAN DAN KESEHATAN KERJA PADA PEKERJAAN PENGADAAN DAN PEMANCANGAN SPUN PILE JEMBATAN JEJANGKIT. Diploma thesis, UNIVERSITAS ISLAM KALIMANTAN MAB.
|
Text
pdf abstrak.pdf Download (116kB) |
|
|
Text
Lembar pengesahan.pdf Download (78kB) |
|
|
Text
lembar keaslian.pdf Download (80kB) |
Abstract
ABSTRAK Penelitian ini membahas keselamatan dan kesehatan kerja (K3) pada pekerjaan pengadaan dan pemancangan spun pile di proyek Jembatan Jejangkit. Tujuan dari penelitian ini adalah untuk mengidentifikasi potensi bahaya, menilai tingkat risiko, menerapkan pengendalian risiko, serta mengetahui nilai residual risk setelah penerapan pengendalian. Metode yang digunakan adalah HIRARC (Hazard Identification, Risk Assessment, and Risk Control). Hasil penelitian menunjukkan adanya berbagai risiko kerja yang didominasi oleh kategori risiko sedang dan rendah, dengan sebagian kecil tergolong risiko tinggi. Pengendalian risiko dilakukan berdasarkan hirarki pengendalian, dimulai dari eliminasi hingga penggunaan alat pelindung diri (APD). Residual risk yang tersisa setelah pengendalian umumnya berada dalam kategori dapat diterima. Penelitian ini menegaskan pentingnya implementasi SMK3 secara konsisten untuk menciptakan lingkungan kerja yang aman dan produktif di proyek konstruksi berisiko tinggi seperti pemancangan pondasi jembatan. ABSTRCT This study examines occupational safety and health (OSH) in the procurement and installation of spun piles for the Jejangkit Bridge project. The objective is to identify potential hazards, assess risk levels, apply risk control measures, and evaluate the residual risk after control efforts. The research uses the HIRARC (Hazard Identification, Risk Assessment, and Risk Control) method. Results indicate that most risks fall under moderate and low categories, with a few classified as high. Risk control measures include elimination, substitution, engineering controls, administrative controls, and personal protective equipment (PPE). The remaining residual risk is generally at an acceptable level. This study highlights that effective implementation of OSH management significantly enhances worker safety in high-risk construction projects such as pile foundation installations.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Kesehatan dan Keselamatan Kerja (K3), HIRARC, spun pile, risiko kerja, pengendalian risiko. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment |
| Depositing User: | Heldianoor |
| Date Deposited: | 07 May 2026 05:43 |
| Last Modified: | 07 May 2026 05:43 |
| URI: | http://eprints.uniska-bjm.ac.id/id/eprint/35402 |
Actions (login required)
![]() |
View Item |

