ANALISIS BIAYA WAKTU DAN PRODUKTIVITAS ALAT BERAT PADA PROYEK PENINGKATAN KAPASITAS JALAN ANJIR TALARAN – TABUKAN RAYA

sari, Suci Indah (2021) ANALISIS BIAYA WAKTU DAN PRODUKTIVITAS ALAT BERAT PADA PROYEK PENINGKATAN KAPASITAS JALAN ANJIR TALARAN – TABUKAN RAYA. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL SUCI INDAH_ (2)1617431362529.pdf

Download (878kB)

Abstract

Ruas jalan Anjir Talaran dan Tabukan Rayayang menghubungkan masyarakat . Ruas jalan ini merupakan sarana utama penghubung dan menjadi sarana yang sangat mempengaruhi apabila terjadi kerusakan yang cukup besar menimpa ruas jalan ini. Berdasarkan data yang dianalisis, variabel bebas pada penelitian ini adalah data penyelidikan yaitu berupa alat berat yang digunakan untuk melaksanakan pekerjaan peningkatan kapasitas jalan Dari perhitungan analisis produktivitas, biaya dan waktu pada pelaksanaan pekerjaan Lapis Pondasi Agregat Kelas A (LPA) dapat disimpulkan sebagai berikut :Analisis Biayaoperasional pelaksanaan pekerjaan Lapis Pondasi Agregat Kelas A (LPA) Dump Truck sebesar Rp. 348.529,02per jam., biaya operasional Motor Gradersebesar Rp. 417.850,84 per jam dan biaya operasional Vibratory Roller sebesar Rp. 258.494,14per jam, biaya operasional Water Tanker sebesar Rp. 261.994,64 per jam. Analisis waktu pelaksanaan pekerjaan Lapis Pondasi Agregat Kelas A (LPA) yang dibutuhkan Dump Truck yaitu 52,9 jam , Waktu yang dibutuhkan Motor Grader yaitu 16,8 jam , waktu yang dibutuhkan Vibratory Roller yaitu 2,14 jam, dan waktu yang dibutuhkan Water tanker yaitu 5,3 jam dan Produktivitas alat berat pada pekerjaan Lapis Pondasi Agregat Kelas A (LPA) Dump Trucksebesar 7,13 m3/jam, produksi Motor Grader sebesar 22,47 m3/jam dan produksi Vibratory Roller sebesar 1,764m3/jam, dan produksi Water Tanker sebesar 71,14 Anjir Talaran and Tabukan Raya roads that connect the community. This road section is the main means of connecting and becomes a means that greatly affects if there is significant damage to this road segment. Based on the analyzed data, the independent variable in this study is the investigative data, namely in the form of heavy equipment used to carry out road capacity building work From the calculation of the analysis of productivity, cost and time in the implementation of Class A Aggregate Base (LPA) work, it can be concluded as follows: Analysis of operational costs for the implementation of Class A Aggregate Base (LPA) Dump Truck work is Rp. 348,529.02 per hour., Motor Graders operating costs of Rp. 417,850.84 per hour and a Vibratory Roller operating cost of Rp. 258,494.14 per hour, the operational cost of the Water Tanker is Rp. 261,994.64 per hour. Analysis of the implementation time for the Class A Aggregate Foundation (LPA) work required by the dump truck is 52.9 hours, the time required for the motor grader is 16.8 hours, the time required for the vibratory roller is 2.14 hours, and the time required for water tanker namely 5.3 hours and productivity of heavy equipment in Class A Aggregate Foundation (LPA) Dump Trucks work of 7.13 m3 / hour, Motor Grader production is 22.47 m3 / hour and Vibratory Roller production is 1.764m3 / hour, and production Water Tanker of 71.14.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Biaya Waktu, Produktivitas Alat Berat, Proyek Kapasitas Time Costs, Heavy Equipment Productivity, Capacity Projects
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Suci Indah Sari
Date Deposited: 22 Sep 2021 03:19
Last Modified: 22 Sep 2021 03:19
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4707

Actions (login required)

View Item View Item