Daerah kuala pembuang merupakan daerah isolated, untuk sekarang daerah kuala pembuang masih disuplai dengan PLTD. Mengikuti pertumbuhan beban dan kebutuhan energi listrik di daerah kuala pembuang, maka dilakukan pembaharuan dari PLTD menjadi Gardu Induk 150 kV untuk masuk kedalam sistem Barito, yang mana sistem Barito ini disuplai oleh PLTU Asam-asam, PLTU Pulang Pisau, dan PLTMG Bangkanai. Seiring dengan proses pembangunan Gardu Induk di Kuala Pembuang, pada tahun 2019 telah dilaksanakan proses pembangunan tower SUTT 150 kV dari Gardu Induk 150 kV PLTU Sampit menuju Gardu Induk 150 kV Kuala Pembuang. Pada saat ini masih dalam tahap pebangunan konstruksi, yaitu pembuatan pondasi awal, dan dapat diketahui bahwa pada pembuatan Tugas Akhir ini keadaan tower transmisi masih belum didirikan. Namun dalam tahap perencanaan tidak terdapat tipe transposition tower yang digunakan pada saluran transmisi. Mengingat jarak yang jauh antara Gardu Induk 150 kV PLTU Sampit menuju Gardu Induk 150 kV Kuala Pembuang, yang diperkirakan dapat menyebabkan impedansi transmisi yang tidak seimbang, maka perlu dipertimbangkan untuk penggunaan tipe transposition tower untuk merubah posisi kawat fasa. Dalam proses pembangunan tower SUTT 150 kV tersebut, diperlukan perencanaan dan analisa mengenai jenis dan tipe tower yang cocok untuk digunakan agar proses penyaluran energi listrik dapat maksimal. Permasalahan penulis adalah, menentukan harga impedansi pada saluran transmisi 150 kV GI Sampit – GI Kuala Pembuang, apakah efisien untuk menggunakan transposition tower, atau harga impedansi yang tidak seimbang bisa diabaikan karena tidak terlalu mepengaruhi efisiensi penyaluran daya listrik. Hasil dari penelitian ini yaitu memperoleh kesimpulan dari pembahasan penerapan transposition tower pada GI PLTU Sampit – GI Kuala Pembuang yang diharapkan dapat menjadi salah satu pertimbangan dalam menentukan penambahan tipe transposition tower pada jalur transmisi 150 kV Gardu Induk Sampit - Gardu Induk Kuala Pembuang. The Kuala Pembuang area is an isolated area, for now the Kuala Pembuang area is still supplied with PLTD. Following the growing load and demand for electrical energy in the kuala waster area, a renewal was made from the PLTD to a 150 kV substation to enter the Barito system, where the Barito system is supplied by PLTU Asam-Asam, PLTU Pulang Pisau, and PLTMG Bangkanai. Along with the construction process of the substation in Kuala Pembuang, in 2019 the process of building a 150 kV SUTT tower from the Sampit PLTU 150 kV substation to the Kuala Pembuang 150 kV substation has been carried out. At this time, it is still in the construction stage, namely the initial foundation construction, and it can be seen that in the making of this final project the transmission tower has not yet been built. However, in the planning stage, there is no type of transposition tower used on the transmission line. Given the long distance between the 150 kV substation of the Sampit PLTU to the 150 kV Kuala Pembuang substation, which is thought to cause unbalanced transmission impedance, it is necessary to consider the use of a transposition tower type to change the position of the phase wire. In the process of building the SUTT 150 kV tower, planning and analysis are needed regarding the types and types of towers that are suitable for use so that the electrical energy distribution process can be maximized. The problem of the author is to determine the impedance value on the 150 kV GI Sampit - GI Kuala Pembuang transmission line, is it efficient to use a transposition tower, or the unbalanced impedance price can be ignored because it does not really affect the efficiency of electric power distribution. The results of this study are to obtain conclusions from the discussion of the application of the transposition tower at the PLTU Sampit-GI Kuala Pembuang substation which is expected to be one of the considerations in determining the addition of the type of transposition tower on the 150 kV transmission line at the Sampit Main Substation - Kuala Pembuang Substation.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Transposition tower, Impedansi Transmisi, SUTT 150 kV Transposition tower, transmission impedance, 150 kV SUTT
Subjects: T Technology > T Technology (General)
Depositing User: Farid Laksmana
Date Deposited: 03 May 2021 03:17
Last Modified: 03 May 2021 03:17
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4736

Actions (login required)

View Item View Item