ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASH PROGRAM TERHADAP WAKTU DAN BIAYA PADA PEMBANGUNAN GEDUNG ASRAMA MAHASISWA IAIN BATOLA DI BANJARMASIN (TAHAP I)

Kini, Kini (2021) ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASH PROGRAM TERHADAP WAKTU DAN BIAYA PADA PEMBANGUNAN GEDUNG ASRAMA MAHASISWA IAIN BATOLA DI BANJARMASIN (TAHAP I). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL SKRIPSI.pdf

Download (251kB)

Abstract

Pada proyek Pembangunan Gedung Asrama Mahasiswa IAIN Batola di Banjarmasin (Tahap I) ini terdapat keterlambatan dua bulan lebih diawal-awal pekerjannya dikarenakan adanya pandemi (Covid-19) sehingga ada penundaan pekerjaan yang mengalami deviasi sebesar -11,88. Skripsi ini upaya mencari solusi dari masalah percepatan penyelesaian proyek pada pelaksanaan proyek Pembangunan Gedung Asrama Mahasiswa IAIN Batola di Banjarmasin (Tahap I) menggunakan metode percepatan (crashing). Keterlambatan proyek dapat di antisipasi dengan melakukan percepatan (crashing) dalam pelaksanaannya, namun harus tetap memperhatikan faktor biaya. Pertambahan biaya yang dikeluarkan diharapkan seminimum mungkin dan tetap memperhatikan standar mutu. Hasil dari Analisis yang didapat dengan menggunakan metode crashing program pada pembangunan gedung asrama mahasiswa IAIN Batola di Banjarmasin (tahap I) dengan penambahan jam lembur 3 jam, ini dapat diselesaikan dalam waktu 187 hari. Dan untuk jam lembur 2 jam dapat diselesaikan dalam waktu 192 hari, sementara untuk jam lembur 1 jam dapat diselesaikan dalam waktu 199 hari. Dengan waktu penyelesaian normal proyek yaitu 210 hari, biaya yang dibutuhkan adalah sebesar Rp. 1,099,638,000.00,- Dengan menambah 3 jam penambahan jam kerja lembur dengan biaya total proyek menjadi Rp. 1,175,070,408.04, Dengan menambah 2 jam penambahan jam kerja lembur sehingga total biaya proyek menjadi Rp. 1,167,241,967.55, sedangkan Dengan menambah 1 jam penambahan jam kerja lembur total biaya proyek menjadi Rp. 1,159,877,197.27. Perbandingan biaya dan waktu proyek normal dan dipercepat untuk percepatan dengan penambahan jam lembur 3 jam untuk durasi selisih 23 hari dari durasi normal. Dan untuk biaya tambahan sebesar Rp. 75,432,408.04. dengan penambahan jam lembur 2 jam untuk durasi selisih 18 hari dari durasi normal dengan biaya tambahan sebesar Rp. 67,603,967.55. Untuk penambahan jam lembur 1 jam untuk durasi selisih 11 hari dari durasi normal dengan biaya tambahan sebesar Rp.60.239.197,27. 4. Solusi untuk percepatan pada proyek Pembangunan Gedung Asrama Mahasiswa IAIN Batola di Banjarmasin (Tahap I) adalah dengan cara menambah jam lembur 3 jam dan penambahan tenaga kerja, karena dengan melakukan dua alternatif tersebut keterlambatan selama 63 hari dengan deviasi -11,88% bisa diatasi dengan 70 hari percepatan dengan biaya tambahan sebesar Rp. 130.852.408,04,- dengan cost slope Rp.4.458.818,84.- In the IAIN Batola Student Dormitory Building Project in Banjarmasin (Phase I) there were two months at the beginning of work due to pandemi (Covid-19) so that there was a delay in work which experienced a deviation of -11.88. This thesis is an attempt to find a solution to the problem of accelerating the completion of the project in the IAIN Batola Student Dormitory Building Construction project in Banjarmasin (Phase I) using the crashing method. Project delays can be anticipated by accelerating (crashing) in its implementation, but must pay attention to the cost factor. It is hoped that the incremental costs incurred are minimal and still pay attention to quality standards. The results of the analysis obtained using the crashing program method in the construction of the IAIN Batola student dormitory building in Banjarmasin (stage I) with the addition of 3 hours of overtime, this can add to the time in 187 days. And for 2 hours overtime it can overflow in 192 days, while for 1 hour overtime it can build up in 199 days. With a normal project completion time of 210 days, the required cost is Rp. 1,099,638,000.00, - By adding 3 hours of additional hours of overtime work, the total project cost becomes Rp. 1.175.070.408.04, By adding an additional 2 hours of overtime work so that the total project cost becomes Rp. 1,167,241,967.55, meanwhile by adding 1 hour of additional overtime working hours the total project cost becomes Rp. 1,159,877,197.27. Comparison of normal and accelerated project cost and time for acceleration by adding 3 hours of overtime hours for a 23 day difference from normal duration. And for an additional fee of Rp. 75.432.408.04. with the addition of 2 hours of overtime for the duration of a difference of 18 days from the normal duration with an additional fee of Rp. 67,603,967.55. For an additional 1 hour overtime for the duration, it is 11 days apart from the normal duration with an additional fee of Rp. 60,239,197.27. 4. The solution for accelerating the IAIN Batola Student Dormitory Building Project in Banjarmasin (Phase I) is by adding 3 hours of overtime and additional labor, because doing these two alternatives can be done for 63 days with a deviation of -11.88% overcome by 70 days of speed at an additional cost of Rp. 130,852,408.04, - with a cost slope of Rp. 4,558,818.84.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Analisis, Waktu, Biaya, Crashing, Jam Lembur Analysis, Time, Cost, Crashing, Overtime Hours
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Kini
Date Deposited: 19 Apr 2021 02:19
Last Modified: 19 Apr 2021 02:19