ANALISIS PERBANDINGAN HARGA SATUAN PEKERJAAN BERDASARKAN RENCANA ANGGARAN BIAYA DAN BIAYA RIIL PROYEK

Sintia Shalyta, Vaniya (2021) ANALISIS PERBANDINGAN HARGA SATUAN PEKERJAAN BERDASARKAN RENCANA ANGGARAN BIAYA DAN BIAYA RIIL PROYEK. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ANALISIS PERBANDINGAN HARGA SATUAN PEKERJAAN BERDASARKAN RENCANA ANGGARAN BIAYA DAN BIAYA RIIL PROYEK.pdf

Download (410kB)

Abstract

Biaya yang dikeluarkan dalam menyelesaikan suatu proyek (real cost) tidak sama persis dengan biaya rencana yang tercantum dalam Rencana Anggaran Biaya (RAB). Kebutuhan jumlah tenaga kerja per volume pekerjaan yang selanjutnya yang disebut koefisien tenaga kerja, sangat dipengaruhi oleh produktivitas sumber daya manusia. Koefisien tenaga kerja ini merupakan faktor pengali dalam perhitungan harga satuan upah. Sehingga perbedaan nilainya akan menghasilkan harga satuan upah yang berbeda antara rencana anggaran biaya dan harga satuan jadi di lapangan. Dari hasil penelitian, didapatkan kesimpulan perhitungan dengan Rencana Anggaran Biaya senilai Rp. 135.909.904, sedangkan hasil perhitungan Biaya Riil Proyek senilai Rp. 117.595.000. dapat perbedaan atau selisih nilai harga satuan pekerjaan sebesar Rp. 18.314.904 dengan selisih biaya 13,48 %. Sedangkan komponen Rencana Anggaran Biaya pada mobilisasi (2,56%) , pada pekerjaan kasa (4,41%) , pada pekerjaan pancangan galam (2,49%), pada pekerjaan pengurukan pasir (90,08%), Sedangkan pada biaya riil proyek pada biaya bahan (69,90%), pada biaya upah (9,91%) , pada biaya alat (1,97%). pada biaya gaji dan administrasi kantor (18,22%) . The costs incurred in completing a project (real cost) are not exactly the same as the plan costs stated in the Budget Plan (RAB). The need for the number of workers per volume of work, hereinafter referred to as the labor coefficient, is strongly influenced by the productivity of human resources. This labor coefficient is a multiplying factor in calculating the unit wage price. So that the difference in value will result in a different wage unit price between the planned cost budget and the finished unit price in the field.Departing from that, the authors have the initiative to conduct research related to differences in costs and components of work based on budget plans and real project costs. it is concluded that the calculation of the Budget Plan is Rp. 135,909,904, while the calculation result of the Real Project Cost is Rp. 117,595,000. can be a difference or difference in the value of the unit price of Rp. 18,314,904 with a difference in costs of 13.48%. While the component of the Budget Plan for mobilization (2.56%), for gauze work (4.41%), for galam casting (2.49%), for sand filling work (90.08%), while for the real cost projects on material costs (69.90%), on wages costs (9.91%), on equipment costs (1.97%). on salary and office administration costs (18.22%).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Rencana Anggaran Biaya, Biaya Riil, Proyek Budget Plans, Real Costs, Projects
Subjects: Q Science > Q Science (General)
Depositing User: S.T Vaniya Sintia Shalyta
Date Deposited: 19 Apr 2021 02:21
Last Modified: 19 Apr 2021 02:21
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4880