EVALUASI DAN ANALISA WAKTU DAN BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI (STUDI KASUS PROYEK GEDUNG BPPRD, KOTA BANJARBARU KALIMANTAN SELATAN)

Prayogo, Haddi (2021) EVALUASI DAN ANALISA WAKTU DAN BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI (STUDI KASUS PROYEK GEDUNG BPPRD, KOTA BANJARBARU KALIMANTAN SELATAN). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL HADI OKY-dikonversi.pdf

Download (493kB)

Abstract

Evaluasi Dan Analisa Waktu Dan Biaya Pada sebuah Pelaksanaan Proyek Konstruksi (Studi Kasus Proyek Gedung Bpprd, Kota Banjarbaru Kalimantan Selatan). Dalam pelaksanaan suatu proyek sangat jarang ditemui suatu proyek yang berjalan tepat sesuai dengan sesuatu yang sudah direncanakan. Umumnya mengalami ke terlambatan baik waktu mau pun ke maju an dari pekerjaan yang dikerjakan, tetapi juga ada proyek yang meng-alami percepatan dari jadwal awal yang sudah direncanakan. Untuk meng-hindari kerugian dalam suatu proyek, kita dapat meramalkannya (forecasting) terhadap biaya yang selesai pada sebuah proyek dengan Konsep Nilai Hasil (Earned Value Analysis). Penelitian ini akan dilakukan untuk melakukan evaluasi pengendalian pada waktu dan biaya yang ada diproyek pembangunan Gedung Kantor Badan Pengelolaan Pajak dan Retribusi Daerah (BPPRD) Kota Banjarbaru, Kalimantan Selatan, dimana konsultan pengawas proyek ini ialah CV. JEMBER JAYA. Berdasarkan hasil analisis perhitungan penulis, dari segi waktu nilai SPI minggu ke-12 < 1, artinya pelaksanaan terlambat, tetapi pada minggu ke-21 nilai SPI = 1, artinya proyek selesai tepat waktu. Sedangkan dari segi biaya nilai CPI minggu ke-10 sampai minggu ke-18 nilainya < 1, artinya pengeluaran lebih banyak dari rencana. Kemudian pada minggu ke-19 sampai minggu terakhir nilai CPI > 1, artinya pengeluaran lebih kecil dari yang direncanakan. Sehingga ditarik kesimpulan waktu penyelesaian proyek sesuai dengan jadwal yang sudah direncanakan, tidak mengalami keterlambatan atau percepatan waktu selesai. Dan biaya yang dikeluarkan memiliki sisa anggaran. Evaluation and Analysis of Time and Cost on Construction Project Implementation (Case Study of Bpprd Building Project, Banjarbaru City, South Kalimantan). In implementing a project, it is very rare to find a project that goes right in accordance with something that has been planned. Often experience delays in both time and progress of a work being done, but there are also projects that experience acceleration from the initial planned schedule. To avoid losses in a project, we can predict (forecast) the costs that are completed on a project with the Concept of Value Results (Earned Value Analysis). This research will be conducted to evaluate the time and costs of the project construction of the Office of the Regional Tax and Retribution Management Agency (BPPRD) Banjarbaru City, South Kalimantan, where the project supervisory consultant is at CV. JEMBER JAYA. Based on the results of the author's calculation analysis, in terms of time, the SPI value for the 12th week was <1, meaning that the implementation was late, but at the 21st week the SPI value = 1, meaning that the project was completed on time. Meanwhile, in terms of cost, the CPI value for week 10 to week 18 is <1, the expenditure is more than planned. Then at week 19 to week the CPI value is> 1, meaning that lastly the expenditure was smaller than planned. So the conclusion of the project completion time in accordance with the planned schedule, cannot occur or the completion time acceleration. And the costs incurred have the remaining budget.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Earned Value, analysis, evaluation, time and cost.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Johan
Date Deposited: 26 Apr 2021 04:31
Last Modified: 26 Apr 2021 04:31
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4986

Actions (login required)

View Item View Item