PERENCANAAN PROGRAM KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN MESJID DI KAWASAN ISLAMIC CENTER TAHAP II, KABUPATEN HULU SUNGAI SELATAN

ISDYANTO, KHUKUH (2021) PERENCANAAN PROGRAM KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN MESJID DI KAWASAN ISLAMIC CENTER TAHAP II, KABUPATEN HULU SUNGAI SELATAN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Artikel Khukuh Repository-dikonversi.pdf

Download (18kB)

Abstract

Pekerjaan Kontruksi pada Pembangunan Mesjid di Kawasan Islamic Center Tahap II, Kabupaten Hulu Sungai Selatan, memiliki luas bangun 48 meter x 36 meter, potensi bahaya yang dimiliki bagi para pekerja cukup penting. Banyaknya metode dalam pengerjaan yang dilakukan. Penelitian dilakukan bersama PT. DAMAN VARIAKARYA yaitu Project Manager dan Site Manager sebagai Kontraktor Pelaksana. Diketahui dari metode HIRADC nilai tertinggi pada pekerjaan beton sebesar 5,000, sedangkan nilai terendah sebesar 2,750 pada pekerjaan lantai kategori ringan. Berdasarkan hal tersebut pengaruh biaya cukup signifikat. Pada Pengadaan Alat Pelindung Diri sebesar Rp.145.618.000,00 pada total ketika terjadinya kecelakaan sebesar Rp.211.545.000,00 dengan bantuan metode BPJS Ketenagakerjaan sedangkan metode Benefit Cost Ratio memuahkan hasil dengan angka kelayakan dengan nilai 1,452. Proyek Pembangunan Mesjid di Kawasan Islamic Center Tahap II, Kabupaten Hulu Sungai Selatan memiliki kelayakan yang pasti. Construction work on the construction of a mosque in the Islamic Center Area Phase II, Hulu Sungai Selatan Regency, has a construction area of 48 meters x 36 meters, the potential danger for workers is quite important. The number of methods in the work carried out. The research was conducted with PT. DAMAN VARIAKARYA, namely Project Manager and Site Manager as Implementing Contractor. It is known from the HIRADC method that the highest value for concrete works is 5,000, while the lowest value is 2,750 for lightweight floor works. Based on this, the cost effect is quite significant. The Procurement of Personal Protective Equipment is Rp.145,618,000.00 in the total when an accident occurs, it is Rp.211,545,000.00 with the assistance of the BPJS Employment method, while the Benefit Cost Ratio method produces satisfactory results with a feasibility score of 1,452. The Mosque Development Project in the Islamic Center Area Phase II, Hulu Sungai Selatan Regency has definite feasibility.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Proyek Kontruksi, Kesehatan dan Keselamatan Kerja (K3), HIRADC, BPJS Ketenagakerjaan, Benefit Cost Ratio Construction Project, Occupational Health and Safety (K3), HIRADC, BPJS Employment, Benefit Cost Ratio
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Khukuh Isdyanto
Date Deposited: 23 Sep 2021 04:00
Last Modified: 23 Sep 2021 04:00
URI: http://eprints.uniska-bjm.ac.id/id/eprint/7681

Actions (login required)

View Item View Item