STUDI DAYA DUKUNG VERTIKAL PONDASI BORE PILE BERDASARKAN DATA N-SEPERTI, PDA DAN METODE ELEMEN HINGGA

Refallandi Kesuma, Ilyas (2021) STUDI DAYA DUKUNG VERTIKAL PONDASI BORE PILE BERDASARKAN DATA N-SEPERTI, PDA DAN METODE ELEMEN HINGGA. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Jurnal Skripsi Daya Dukung fix.pdf

Download (3MB)

Abstract

Pondasi bore pile menahan dan meneruskan beban yang bekerja dalam sistem rekayasa konstruksi ke lapisan tanah dibawahnya. Pondasi bore pile memiliki keunggulan dapat menembus batuan jika dibandingkan dengan pondasi tiang pancang hal ini adalah salah satu penyebab digunakannya pondasi ini dalam proyek pembangunan jembatan Aranio.Daya dukung ijin harus lebih besar dari gaya yang bekerja penelitian ini bertujuan mengevaluasi dan membandingkan besarnya daya dukung yang diperoleh dari berbagai metode, effisiensi kelompok tiang pondasi borepile serta penurunan yang terjadi akibat beban yang bekerja. Metode yang digunakan antara lain Resee&Wright,Poulus&Davis,Metode Feld dan Metode Elemen Hingga yaitu software Plaxis2D V 8.6 sebagai alat bantu hitung dan pemodelan, sehingga nantinya hasil analisis dapat dibandingkan. Hasil penelitian menunjukkan bahwa daya dukung ultimit(Qu) berdasarkan metode Reese&Wright sebesar 733,22 ton,Metode PDA sebesar 633 ton dan metode elemen hingga sebesar 687,25 ton. Penurunan yang terjadi dengan metode Poulus&Davis sebesar 1,32mm,metode PDA sebesar 7,4 mm dan metode elemen hingga sebesar 1,60mm. Berdasarkan hasil yang diperoleh perlu dilakukan analisis lanjutan dengan metode lainnya,agar di dapatkan hasil yang bervariasi. The bore pile foundation holds and transmits the loads that work in the construction engineering system to the subsoil. Bore pile foundations have the advantage of being able to penetrate rocks when compared to pile foundations, this is one of the reasons why this foundation is used in the Aranio bridge construction project. Permitted bearing capacity must be greater than the working force. This study aims to evaluate and compare the magnitude of the bearing capacity obtained. from various methods, the efficiency of the borepile pile group and the settlement that occurs due to the working load. The methods used include Resee & Wright, Poulus & Davis, Feld Method and Finite Element Method, namely Plaxis2D V 8.6 software as a calculation and modeling tool, so that later the results of the analysis can be compared. The results showed that the ultimate bearing capacity (Qu) based on the Reese & Wright method was 733.22 tons, the PDA method was 633 tons and the finite element method was 687.25 tons. The decrease that occurs with the Poulus & Davis method is 1.32mm, the PDA method is 7.4 mm and the finite element method is 1.60mm. Based on the results obtained, it is necessary to carry out further analysis with other methods, in order to obtain varying results.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Bore Pile, Metode Elemen Hingga Bore pile, Finite Element Method
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TG Bridge engineering
Depositing User: Ilyas Refallandi Kesuma
Date Deposited: 27 Oct 2021 03:10
Last Modified: 27 Oct 2021 03:10
URI: http://eprints.uniska-bjm.ac.id/id/eprint/8681

Actions (login required)

View Item View Item