ANALISIS PERBANDINGAN KOEFISIEN TENAGA KERJA PEKERJAAN PASANGAN DINDING BATA RINGAN ANTARA LAPANGAN DAN STANDAR NASIONAL INDONESIA (SNI) 2016 (Studi Empiris Proyek Gedung Forum Komunikasi Putra-Putri Purnawirawan Indonesia (FKPPI) Banjarmasin)

Prasetyo, Bayu (2022) ANALISIS PERBANDINGAN KOEFISIEN TENAGA KERJA PEKERJAAN PASANGAN DINDING BATA RINGAN ANTARA LAPANGAN DAN STANDAR NASIONAL INDONESIA (SNI) 2016 (Studi Empiris Proyek Gedung Forum Komunikasi Putra-Putri Purnawirawan Indonesia (FKPPI) Banjarmasin). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
JURNALL revisi.pdf

Download (346kB)

Abstract

Dalam pelaksanaan suatu proyek konstruksi baik tahap perencanaan, pelaksanaan maupun pengawasan sangat diperlukan manajemen konstruksi. Salah satunya hal yang terpenting yaitu perhitungan RAB (rencana anggaran biaya). Tujuan dari penelitian ini adalah menganalisis produktivitas tenaga kerja pada pekerjaan pasangan dinding bata ringan dan menganalisis perbandingan nilai koefisien tenaga kerja pakerjaan pasangan dinding bata ringan antara kondisi lapangan dan SNI 2016 pada proyek gedung FKPPI Banjarmasin. Dari penelitian ini diperoleh rata-rata produktivitas tenaga kerja pekerjaan pasangan dinding bata ringan dari 15 hari pengamatan adalah 41,281 m2/hari. Koefisien tenaga kerja pada pekerjaan pasangan dinding bata ringan (Pekerja 0,052), (Tukang 0,097), (Kepala Tukang 0,007), (Mandor 0,002). Perbandingan koefisien tenaga kerja antara lapangan dan SNI 2016 untuk pekerjaan pasangan dinding bata ringan (Pekerja 1 : 0,077), (Tukang 1 : 0,074), (Kepala Tukang 1 : 0,053), (Mandor 1 : 0,666). In the implementation of a construction project, both the planning, implementation and supervision stages, construction management is very necessary. One of the most important things is the calculation of the RAB (budget plan). The purpose of this study was to analyze labor productivity on lightweight masonry masonry work and analyze the comparison of the labor coefficient values for light brick masonry work between field conditions and SNI 2016 on the Banjarmasin FKPPI building project. From this study, it was obtained that the average labor productivity of light brick masonry work from 15 days of observation was 41,281 m2/day. Coefficient of labor on light brick masonry work (Worker 0,052), (Tukang 0,097), (Head Builder 0,007), (Foreman 0,002). Comparison of the labor coefficient between the field and SNI 2016 for light brick masonry work (Worker 1: 0,077), (Tukang 1: 0,074), (Head of Builders 1: 0,053), (Foreman 1: 0,666).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Koefisien, Produktivitas Tenaga Kerja, SNI 2016 Coefficient, Labor Productivity, SNI 2016
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Depositing User: Bayu Prasetyo
Date Deposited: 13 Jan 2022 04:24
Last Modified: 13 Jan 2022 04:24
URI: http://eprints.uniska-bjm.ac.id/id/eprint/9272