Abstract

Proteksi tenaga listrik adalah pengaman yang digunakan untuk mengurangi kerusakan peralatan-peralatan listrik akibat adanya gangguan (kondisi abnormal). Semakin cepat reaksi perangkat proteksi yang digunakan, maka semakin sedikitlah pengaruh gangguan terhadap kemungkinan kerusakan alat. Sehingga daerah yang terganggu dapat segera di lokalisir dan mencegah terjadinya black out. Masuknya Gardu Induk Kandangan pada Subsistem Kandangan di PT PLN (Persero) UP3 Barabai menyebabkan adanya perubahan konfigurasi sistem. Tujuan penelitian ini adalah dapat mencari tahu Perhitungan nilai arus hubung singkat pada penyulang KDG02 setelah masuknya GI Kandangan, lalu dapat mencari tahu cara Perhitungan setting proteksi pada penyulang KDG02 yang mengalami perubahan konfigurasi dan terakhir dapat menganalisa proteksi subsitem kandangan karena masuknya GI Kandangan menggunakan Simulasi ETAP 12.6. Untuk meningkatkan kehandalan akibat adanya rekonfigurasi pada Subsistem Kandangan, maka perlu dilakukan perhitungan setting proteksi relai arus lebih (OCR) dan relai gangguan tanah (GFR) pada penyulang yang mengalami perubahan konfigurasi terutama pada penyulang KDG02. Hasil perhitungan setting proteksi akan disimulasikan menggunakan Software ETAP 12.6 terhadap permasalahan. Pada penyulang dengan konfigurasi express KDG02, Relai bekerja dengan tepat saat mengatasi gangguan sesuai setting dan wilayah kerjanya. Ketika terjadi gangguan di sisi penyulang KDG02 sebesar 628 A yang merupakan arus gangguan terkecil maka akan dideteksi oleh relai karena setting arusnya di 180 A, maka CB yang pertama kali bekerja adalah CB penyulang KDG02 dan tidak mempengaruhi CB di sisi Incoming karena koordinasi proteksi relai memerintahkan KDG02 open sebelum arus gangguan masuk ke sisi Incoming. Electrical power protection is a safety device used to reduce damage to electrical equipment due to interference (abnormal conditions). The faster the reaction of the protective device used, the less interference will affect the possibility of equipment damage. So that disturbed areas can be localized immediately and prevent black outs. The inclusion of the Kandangan Substation in the Kandangan Subsystem at PT PLN (Persero) UP3 Barabai causes a change in system configuration. The purpose of this study is to find out the calculation of the value of the short circuit current in the KDG02 feeder after the entry of the Kandangan GI, then to find out how to calculate the protection settings on the KDG02 feeder which has changed configuration and finally to analyze the protection of the enclosure subsystem due to the entry of the Kandangan GI using ETAP 12.6 Simulation. . To increase reliability due to reconfiguration of the Kandangan Subsystem, it is necessary to calculate the protection settings for the overcurrent relay (OCR) and ground fault relay (GFR) for the feeder that has changed configuration, especially for the KDG02 feeder. The calculation results of the protection settings will be simulated using ETAP 12.6 software against problems. In the feeder with the express configuration KDG02, the relay works correctly when dealing with disturbances according to the settings and working area. When a fault occurs on the KDG02 feeder side of 628 A which is the smallest fault current it will be detected by the relay because the current setting is at 180 A, the CB that works first is the KDG02 feeder CB and does not affect the CB on the Incoming side because the relay protection coordination commands KDG02 open before the fault current enters the Incoming side.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Proteksi Tenaga Listrik, Koordinasi Proteksi, OCR, GFR, ETAP 12.6 Electric Power Protection, Protection Coordination, OCR, GFR, ETAP 12.6
Subjects: T Technology > T Technology (General)
Depositing User: Iqbal Asad Kutsuro
Date Deposited: 15 Mar 2022 02:42
Last Modified: 15 Mar 2022 02:42
URI: http://eprints.uniska-bjm.ac.id/id/eprint/9274

Actions (login required)

View Item View Item