ESTIMASI PENYEDIAAN SUPLAI DAYA TERHADAP PENAMBAHAN BEBAN TRANSFORMATOR GI 70 KV ULIN DENGAN METODE REGRESI LINEAR SEDERHANA

Esa, Titha Annasith Indra (2022) ESTIMASI PENYEDIAAN SUPLAI DAYA TERHADAP PENAMBAHAN BEBAN TRANSFORMATOR GI 70 KV ULIN DENGAN METODE REGRESI LINEAR SEDERHANA. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Artikel_Titha Annasith Indra Esa_19650060.pdf

Download (380kB)

Abstract

Kebutuhan masyarakat akan listrik semakin bertambah dengan seiring berjalannya waktu. Hal ini disebabkan oleh kebutuhan akan listrik tersebut bergantung dari setiap kegiatan yang dilakukan oleh masyarakat, sehingga, semakin banyak kegiatan yang dilakukan oleh masyarakat dan memerlukan pasokan listrik, maka akan semakin banyak permintaan kebutuhan listrik dari masyarakat kepada PLN. Kota Banjarmasin merupakan Ibu Kota Provinsi Kalimantan Selatan dengan perkembangan ekonomi yang pesat. Setiap kebutuhan masyarakat Kota Banjarmasin akan listrik harus tetap disesuaikan dengan ketersediaan suplai daya dari transformator yang memiliki kapasitas nominalnya masing-masing. Untuk mengatasi perkembangan beban yang ada pada transformator daya GI 70 kV Ulin, maka perlu adanya studi terkait estimasi penyediaan suplai daya terhadap penambahan beban pada transformator daya tersebut menggunakan metode regresi linear sederhana. Metode penelitian yang digunakan meliputi studi literatur, pengumpulan data, perhitungan, dan analisa. Perhitungan dan analisa menggunakan metode regresi linear dapat dilakukan dengan merekap data beban puncak pada tahun 2019 – 2020, menghitung konstanta dan koefisien dari fungsi regresi linear sederhana, menghitung estimasi beban puncak pada 10 tahun mendatang, dan melakukan analisa hasil perhitungan tersebut, sehingga dapat menentukan kapasitas transformator yang perlu disediakan. Berdasarkan hasil analisa perhitungan menggunakan metode regresi linear sederhana, dapat diketahui bahwa semakin besar beban yang ada pada pelanggan, maka kebutuhan suplai daya juga harus semakin besar. Selain itu, penggunaan metode ini cukup efektif dalam melakukan estimasi kapasitas transformator yang diperlukan karena presentase selisih hasil dengan data yang dimiliki oleh PLN adalah < 5%, sehingga kapasitas transformator Gardu Induk 70 kV Ulin yang diperlukan untuk pemakaian 10 tahun mendatang adalah transformator yang dapat menampung beban sebesar 156,53 MW. People's need for electricity is increasing with time. This is because the need for electricity depends on every activity carried out by the community, so that the more activities carried out by the community and require electricity supply, the more demand for electricity from the community to PLN. Banjarmasin City is the capital city of South Kalimantan Province with rapid economic development. Every need of the people of Banjarmasin City for electricity must be adjusted to the availability of power supply from transformers that have their respective nominal capacities. To overcome the development of the load on the 70 kV Ulin GI power transformer, it is necessary to have a study related to the estimation of the supply of power for the additional load on the power transformer using a simple linear regression method. The research methods used include literature study, data collection, calculation, and analysis. Calculations and analysis using the linear regression method can be done by recapitulating peak load data in 2019 – 2020, calculating constants and coefficients from a simple linear regression function, calculating peak load estimates in the next 10 years, and analyzing the results of these calculations, so as to determine capacity. transformer that needs to be provided. Based on the results of the calculation analysis using a simple linear regression method, it can be seen that the greater the load on the customer, the greater the need for power supply. In addition, the use of this method is quite effective in estimating the required transformer capacity because the percentage difference between the results and the data owned by PLN is < 5%, so the transformer capacity of the 70 kV Ulin Substation needed for use in the next 10 years is a transformer that can accommodate load of 156.53 MW.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Gardu Induk, Transformator, Kenaikan Beban, Arus Beban Puncak, Regresi Linier Sederhana Substation Transformer, Load Increase, Peak Load Current, Simple Linear Regression
Subjects: T Technology > T Technology (General)
Depositing User: Titha Annasith Indra Esa
Date Deposited: 09 Feb 2022 03:55
Last Modified: 09 Feb 2022 03:55
URI: http://eprints.uniska-bjm.ac.id/id/eprint/9362

Actions (login required)

View Item View Item