ANALISIS WASTE MATERIAL KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG MADRASAH TSANAWIYAH NEGERI 11 TABALONG

AMIN, MUHAMMAD (2022) ANALISIS WASTE MATERIAL KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG MADRASAH TSANAWIYAH NEGERI 11 TABALONG. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
JURNAL MUHAMMAD AMIN 17640102.pdf

Download (696kB)

Abstract

Pada pelaksanaan proyek konstruksi, waste limbah atau sisa bahan bangunan pasti akan muncul. Bahan bangunan yang tersisa diartikan sebagai benda yang melebihi persyaratan, baik berupa hasil karya maupun bahan bangunan yang tertinggal /tersebar/rusak sehingga tidak dapat digunakan lagi sesuai dengan fungsinya. Tujuan dari penelitiaj ini adalah mengidentifikasi jenis – jenis material yang dominan sebagai waste, mengetahui waste level dan waste cost pada proyek pembangunan gedung MTsN 11 Tabalong dan mengetahui cara pengelolaan waste pada proyek pembangunan gedung MTsN 11 Tabalong. Metode yang digunakan adalah waste level, waste cost. Dari hasil perhitungan material yang memiliki persentase waste level terbesar adalah batu bata ½ sebesar 5,22% dengan volume waste sebesar 39,12 m3. Sedangkan material yang memiliki persentase waste level terkecil adalah besi beton ulir D16 sebesar 0,72% dengan volume waste 45,22 Kg. Waste cost pada material yang dominan pada proyek pembangunan gedung MTsN 11 Tabalong, yaitu: Beton K225 sebesar Rp 10.745.956,53, batu bata ½ sebesar Rp7.989.742,51, Keramik ukuran 60 x 60 Homogeneus sebesar Rp 4.325.744,04, Besi beton ulir D16 sebesar Rp 826.316,65, Besi beton ulir D13 sebesar Rp 1.790.220,28, Besi beton polos d10 sebesar Rp 2.049.521,71. Cara pengelolaan waste diantaranya dengan menggunakan material pada proyek selanjutnya dan menjual material kepada supplier. In the implementation of construction projects, waste or residual building materials will inevitably appear. The remaining building materials are defined as objects that exceed the requirements, either in the form of works, or building materials that are left behind / scattered / damaged so that they cannot be used again according to their function. The purpose of this study is to identify the types of materials that are dominant as waste and to know the waste level and waste cost in the construction project of the MTsN 11 Tabalong building and to find out how to manage waste in the construction project of the MTsN 11 Tabalong building. The method used is waste level, waste cost. From the calculation results, the material that has the largest percentage of waste level is brick waste level of 5.22% with a waste volume of 39.12 m3. While the material that has the smallest percentage of waste level is steel screw D16, a waste level of 0.72% with a waste volume of 45.22 kg. Waste Cost on the dominant materials in the construction project of the MTsN 11 Tabalong building, namely: Concrete K225 of Rp 10,745,956.53, Brick Rp 7,989,742.51, Ceramic 60 x 60 Homogeneus of Rp 4,325,744.04 , D16 screwed concrete iron is IDR 826,316.65, D13 screwed concrete iron is IDR 1,790,220,28, D10 plain concrete iron is IDR 2,049,521.71. Ways to manage waste include using materials in the next project and selling materials to suppliers.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Waste, Waste Level, Waste Cost, Cara Pengelolaan
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Amin
Date Deposited: 25 Jan 2022 02:05
Last Modified: 25 Jan 2022 02:05
URI: http://eprints.uniska-bjm.ac.id/id/eprint/9387

Actions (login required)

View Item View Item