ANALISIS BEBAN KERJA KARYAWAN BAGIAN ENGINEERING PT. WIJAYA TRIUTAMA PLYWOOD INDUSTRI DENGAN METODE WORKLOAD ANALYSIS

Prasetya, Faizal Dwi (2022) ANALISIS BEBAN KERJA KARYAWAN BAGIAN ENGINEERING PT. WIJAYA TRIUTAMA PLYWOOD INDUSTRI DENGAN METODE WORKLOAD ANALYSIS. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
JURNAL FAIZAL DWI PRASETYA.pdf

Download (641kB)

Abstract

PT. Wijaya Triutama Plywood Industri merupakan perusahaan industri pengolahan kayu lapis. Perusahaan ini beralamat di Trisakti komplek Uka no. 70245 jl. Basirih, Kota, Banjarmasin, Kalimantan selatan. Dengan banyaknya pekerjaan service mesin tidak menutup kemungkinan karyawan mendapatkan tekanan beban kerja yang begitu besar, seiring beban kerja yang diterima pekerja begitu besar nilai Allowance juga akan meningkat yang berdampak mengurangi efesiensi kerja. Maka dari itu saya selaku mahasiswa berinisiatif untuk mengukur beban kerja dan menentukan efesiensi kerja karyawan yaitu dengan menentukan jumlah karyawan yang optimal. Hasil pengamatan selama 6 hari menunjukan bahwa tingkat produktivitas karyawan Engineering sebesar 80%,waktu baku sebesar 6,06 jam serta beban kerja yang terdiri dari jumlah pengamatan total selama 6 hari sebesar 180, jumlah kegiatan produktif sebesar 144, jumlah menit pengamatan yang dilakukan yaitu sebesar 3.600 menit atau 60 jam, jumlah menit produktif sebesar 2.880 menit dengan jumlah equipment yang berhasil diselesaikan selama 6 hari sebesar 19 unit, serta waktu siklus sebesar 2,53 jam/unit dan waktu normal sebesar 225,492 menit. Berdasarkan pengamatan yang dilakukan beban kerja tidak kurang dari 80%, sehingga dikategorikan bahwa karyawan engineering produktif. PT. Wijaya Triutama Plywood Industri is a plywood processing company. This company is located at Trisakti complex Uka no. 70245 jl. Basirih, City, Banjarmasin, South Kalimantan. With the large number of machine service jobs, it is possible for employees to get such a large workload pressure, as the workload received by workers is so large the value of Allowance will also increase which has an impact on reducing work efficiency. Therefore, as a student, I took the initiative to measure the workload and determine the work efficiency of employees, namely by determining the optimal number of employees. The results of observations for 6 days show that the productivity level of Engineering employees is 80%, the standard time is 6.06 hours and the workload consisting of the total number of observations for 6 days is 180, the number of productive activities is 144, the number of minutes of observations made is equal to 3,600 minutes or 60 hours, the number of productive minutes is 2,880 minutes with 19 units of equipment completed in 6 days, and a cycle time of 2.53 hours/unit and a normal time of 225,492 minutes. Based on observations made, the workload is not less than 80%, so it is categorized that engineering employees are productive.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Beban Kerja, Work Sampling, Workload Analysis (WLA) Workload, Work Sampling, Workload Analysis (WLA)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Faizal Dwi Prasetya
Date Deposited: 08 Mar 2022 04:16
Last Modified: 08 Mar 2022 04:16
URI: http://eprints.uniska-bjm.ac.id/id/eprint/9966

Actions (login required)

View Item View Item