ANALISIS PERBANDINGAN HARGA SATUAN PEKERJAAN (AHSP) BERDASARKAN SNI2016 DAN HARGA LAPANGAN PADA PROYEK REHAB GEDUNG TEACHING FACTORY KOTA BANJARBARU

Nasrullah, Nasrullah (2022) ANALISIS PERBANDINGAN HARGA SATUAN PEKERJAAN (AHSP) BERDASARKAN SNI2016 DAN HARGA LAPANGAN PADA PROYEK REHAB GEDUNG TEACHING FACTORY KOTA BANJARBARU. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL NASRULLAH.pdf

Download (116kB)

Abstract

Dalam tahapan manajemen kontruksi terdapat berbagai permasalahan mengenai pengelolaan anggaran biaya pelaksanaan pekerjaan, sehingga perlu direncanakan suatu rancangan atau estimasi anggaran biaya pelaksanaan pekerjaan dengan menganalisis biaya kontruksi. Seperti yang diketahui prinsip yang mendasar metode SNI adalah daftar koefisien bahan dan upah tenaga kerja yang sudah ditetapkan untuk menganalisis harga atau biaya yangdiperlukan dalam membuat harga satuan pekerjaan bangunan. Pada saat ini, penyedia jasa pada umumnya cenderung menhitung analisis harga satuan tidak seluruhnya berpedoman pada analisis SNI melainkan didasarkan atas analisis sendiri atau pengalaman terdahulu dalam menyelesaikan suatu pekerjaan kontruksi. Berdasarkan hal tersebut, maka diperlukan adanya analisis perbandingan harga satuan pekerjaan antara metode SNI dan Lapangan. Tujuan penelitian ini adalah untuk mengetahui analisis harga satuan menggunakan SNI 2016 dan Lapangan serta mengetahui perbandingan selisih harga kedua metode tersebut. Metode penelitian ini dilakukan dengan cara mengumpulkan data primer dan sekunder. Data Primer yaitu melakukan wawancara dan mengumpulkan data harga material dipasaran serta harga upah, dan data Sekunder yaitu berupa gambar rencana rehab gedung teaching factoy dan rencana anggaran biaya SNI 2016. Hasil dari analisis ini maka didapatkan harga SNI 2016 sebesar Rp.1.112.909.741,92 dan harga lapangan sebesar Rp.869.701.181,55. Berdasarkan hasil dari kedua analisis tersebut maka diketahuiah selisih harga perbandingan sebesar Rp. 243.208.560,37 In the construction management stage, there are various problems regarding the management of the budget for the implementation of the work, so it is necessary to plan a design or estimate the budget for the implementation of the work by analyzing construction costs. As is known, the basic principle of the SNI method is a list of the coefficients of materialsand labor wages that have been determined to analyze the prices or costs required in making unit prices for building works. At this time, service providers generally tend to calculate unit price analysis not entirely based on SNI analysis but based on their own analysis or previous experience in completing a construction work. Based on this, it is necessary to have a comparative analysis of work unit prices between the SNI and Field methods. The purpose of this study was to determine the unit price analysis using SNI 2016 and Field and to find out the comparison of the price difference between the two methods. This research method is done by collecting primary and secondary data. Primary data is conducting interviews and collecting data on material prices in the market and wage prices, and Secondary data in the form of drawings of the teaching factoy building rehabilitation plans and 2016 SNI budget plans. 92 and the field price is Rp. 869.701.181.55. Based on the results of the two analyzes, it is known that the difference in the comparison price is Rp. 243,208,560.37.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Rencana anggaran biaya, SNI 2016, Lapangan Budget plan, SNI 2016, Field
Subjects: T Technology > T Technology (General)
Depositing User: Nasrullah
Date Deposited: 27 Jul 2022 02:44