PUSPITO, WAHYU ALGHIFARI (2023) MANAJEMEN ENERGI DI INDUSTRI: OPTIMASI COOLING TOWER PADA PLTU PULANG PISAU. Diploma thesis, Universitas Islam Kalimantan MAB.
![]() |
Text
HALAMAN PENGESAHAN PEMBIMBING.pdf Download (612kB) |
![]() |
Text
KE ASLIAN SKRIPSI.pdf Download (216kB) |
![]() |
Text
jurnal wahyu puspito 19620202 uniska cooling tower (1).pdf Download (202kB) |
Abstract
respon dengan efisiensi dalam segala hal untuk mendapatkan hasil produksi maksimal serta fokus kepada pelayanan pelanggan. Salah satu faktor yang sangat berpengaruh terhadap pencapaian kinerja tersebut adalah optimasi penggunaan listrik dan efektifitas pengoperasian pada cooling tower. Perkembangan global yang dinamis saat ini menuntut adanya terobosan metode pengoperasian dan pemeliharaan serta rekayasa enjiniring yang tepat. Mode kerusakan yang sering terjadi pada cooling tower adalah kerusakan gearbox yang disebabkan oleh lifetime, scaling & fouling pada drift eliminator, nozzle sprinkler, filler dan stack, serta degradasi pada sudu blade fan. Pun juga dalam pengoperasian cooling tower sering dijumpai breakdown fan yang terjadi sebelum dilakukan inspeksi tahunan. Pada PLTU Pulang Pisau 2 x 60MW terdapat sistim pendingin kondensor turbin yaitu dua set cooling tower jenis counterflow dimana masing-masing set terdapat tiga set kipas atau fan. Desain konfigurasi pola pengoperasian satu set cooling tower untuk satu unit kondensor turbin PLTU 60 MW adalah 3 x 35%. Terjadinya breakdown pada fan dapat menyebabkan penurunan produksi listrik menjadi 37 MW karena terjadi drop vakum kondensor menjadi -82 kPa. Solusi dari permasalahan tersebut diatas adalah optimasi operasi, pemeliharaan dan rekayasa enjiniring dengan melakukan pemasangan water spray pendingin pada semua gearbox fan dan drain pump kolam cooling tower, inspeksi weekly setiap fan secara bergantian menyesuaikan jadwal rencana daya PLN P2B, mematikan satu fan pada saat suhu ambient <25 °C, pada saat inspeksi tahunan dilakukan pembersihan scaling & fouling pada drift eliminator, nozzle sprinkler, filler dan stack dengan waterjet, balancing sudu fan dengan penambalan resin, re-alignment sudu fan & poros gearbox. Metode tersebut guna mencapai target kinerja PLTU serta meningkatkan reliability cooling tower. Karena jika semakin sering terjadi kerusakan yang tidak terduga pada cooling tower akan menyebabkan kerusakannya yang meluas, vakum kondensor rendah menyebabkan produksi listrik menurun yang akan berdampak pada kehandalan sistim kelistrikan Kalseltengtim. The demands of company performance in the current industrial era 4.0 are response speed with efficiency in all respects to get maximum production results and focus on customer service. One of the factors that greatly influences the achievement of this performance is the optimization of electricity use and the effectiveness of operating the cooling tower. Dynamic globalization demands breakthroughs in operating and maintenance methods as well as appropriate engineering techniques. The damage modes that often occur in cooling towers are gearbox damage caused by lifetime, scaling & fouling on drift eliminators, sprinkler nozzles, fillers, and stacks, as well as degradation of blade fan blades. Even in the operation of cooling towers, breakdown fans are often encountered that occur before the annual inspection is carried out. At PLTU Pulang Pisau 2 x 60MW there is a turbine condenser cooling system, namely two sets of counterflow type cooling towers where each set has three sets of fans. The configuration design for the operating pattern of a set of cooling towers for one condenser unit of a 60 MW PLTU turbine is 3 x 35%. The occurrence of a fan breakdown can cause a decrease in electricity production to 37 MW because there is a drop in the condenser vacuum to -82 kPa. The solution to the above problems is optimizing operations, maintenance and engineering by installing a cooling water spray on all gearbox fans and cooling tower pool drain pumps, weekly inspection of each fan alternately adjusting the PLN P2B power plan schedule, turning off one fan at ambient temperature <25 °C, during the annual inspection, scaling & fouling cleaning is carried out on drift eliminator, sprinkler nozzle, filler and stack with waterjet, fan blade balancing with resin filling, fan blade re-alignment & gearbox shaft. This method is intended to achieve the PLTU performance target and increase the reliability of the cooling tower. Because if unexpected damage occurs to the cooling tower it will cause widespread damage, low condenser vacuum causes decreased electricity production which will have an impact on the reliability of the Kalseltengtim electricity system.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | cooling tower, optimasi, fan, kinerja |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Depositing User: | UPT PPJ |
Date Deposited: | 06 Jul 2023 02:02 |
Last Modified: | 06 Jul 2023 02:02 |
URI: | http://eprints.uniska-bjm.ac.id/id/eprint/16979 |