STUDI KAPASITAS SALURAN DRAINASE PADA JALAN PANGERAN ANTASARI KOTA BANJARMASIN

Marni, Marni (2021) STUDI KAPASITAS SALURAN DRAINASE PADA JALAN PANGERAN ANTASARI KOTA BANJARMASIN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL.pdf

Download (705kB)

Abstract

Jalan Pangeran Antasari di Kota Banjarmasin selalu terjadi limpasan banjir ketika terjadi hujan deras. Saluran drainase yang ada tidak mampu menampung kapasitas air hujan tersebut sehingga terjadi limpasan banjir pada Jalan Pangeran Antasari di Kota Banjarmasin. Menyikapi permasalahan ini, maka dilakukan penelitian Studi Kapasitas Saluran Drainase Pada Jalan Pangeran Antasari Kota Banjarmasin untuk mengetahui penyebab dari terjadi limpasan banjir tersebut. Metode yang digunakan adalah Distribusi Gumbel dengan analisis analisis hidrologi menggunakan data curah hujan dari Stasiun Surgi Mufti. Selanjutnya perhitungan debit hujan rencana menggunakan Metode Rasional, perhitungan debit saluran drainase eksisting dan debit normalisasi saluran drainase menggunakan Persamaan manning. Hasil dari perhitungan didapat debit hujan rencana (Qrencana = 1,01 m3/detik), debit saluran drainase eksisting (Qeksisting = 0,83 m3/detik) dan debit normalisasi saluran drainase (Qnormalisasi = 1,08 m3/detik). Qrencana > Qeksisting, ini berarti saluran yang ada sekarang tidak aman. Qnormalisasi > Qrencana, ini menunjukan jika dilakukan normalisasi maka tidak akan terjadi lagi banjir. Hasil dari penelitian ini membuktikan penyebab utama limpasan banjir tersebut adalah tumpukan sampah dan lumpur yang menghambat aliran air di saluran drainase. Solusi dari permasalahan ini ialah dilakukan normalisasi, tanpa perlu harus merencanakan ulang saluran drainase. Peneliti menyarankan untuk melakukan pembersihan secara berkala pada Saluran Drainase Jalan Pangeran Antasari Kota Banjarmasin. Pangeran Antasari street in Banjarmasin City always floods when there is heavy rain. The existing drainage channel was unable to accommodate the rainwater capacity resulting in flood runoff on Pangeran Antasari street in Banjarmasin City. Responding to this problem, a study on Drainage Channel Capacity Study at Pangeran Antasari street, Banjarmasin was conducted to determine the causes of the flood runoff. The method used is the Gumbel distribution with hydrological analysis using rainfall data from the Surgi Mufti Station. Furthermore, the calculation of the planned rain discharge uses the Rational Method, the calculation of the discharge of the existing drainage channel and the discharge of normalization of the drainage channel uses the Manning Equation. The results of the calculation are that the planned rain discharge (Qplan = 1.01 m3 / second), the existing drainage channel discharge (Qexisting = 0.83 m3 / second) and the drainage channel normalization discharge (Qnormalization = 1.08 m3 / second). Qplan> Qeksisting, this means the existing channel is not safe. Qnormalization> Qplan, this shows that if normalization is carried out there will be no more flooding. The results of this study prove that the main cause of the flood runoff is the pile of garbage and mud which hinders the flow of water in the drainage channels. The solution to this problem is to carry out normalization, without the need to re-plan drainage channels. Researchers suggest to periodically clean the Drainage Channel at Pangeran Antasari street, Banjarmasin City.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kapasitas Saluran Drainase, Debit Rencana, Debit Normalisasi Saluran, Drainase Jalan Pangeran Antasari. Drainage Channel Capacity, Design Discharge, Channel Normalization Discharge, Pangeran Antasari Street Drainage.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Marni marni
Date Deposited: 12 Mar 2021 01:54
Last Modified: 12 Mar 2021 01:54
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4414