EVALUASI KINERJA WAKTU PADA PROYEK PEMBANGUNAN STADION 17 MEI DI BANJARMASIN

Rusida, Elisa (2021) EVALUASI KINERJA WAKTU PADA PROYEK PEMBANGUNAN STADION 17 MEI DI BANJARMASIN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL ELISA RUSIDA.pdf

Download (463kB)

Abstract

Metode-metode yang digunakan untuk membuat suatu perkiraan rencana pelaksanaan proyek dapat dilakukan dengan metode penjadwalan Kurva S, dan Earned Value. Untuk penulisan laporan skripsi ini penulis mencoba membahas mengenai penggunaan metode Earned Value pada proyek Pembangunan Stadion 17 Mei yang berada di Banjarmasin dengan penjadwalan Kurva S yang digunakan di lapangan. Sebagai bahan pertimbangan bahwa penggunaan metode penjadwalan Earned Value sudah pasti sehingga dapat digunakan sebagai alat pengendalian waktu. Berdasarkan karateristik metode penjadwalan dengan proyek Pembangunan Stadion 17 Mei, ada kesamaannya yaitu setiap aktivitas harus selesai 100% tidak bisa dikerjakan secara tumpang tindih. Tujuan penelitian untuk Mengetahui Evaluasi Kinerja Waktu Pada Proyek Pembangunan Stadion 17 Mei Di Banjarmasin Metode yang digunakan dalam penelitian ini adalah metode deskriptif. Metode deskriptif analisis dilakukan dengan cara mendeskripsikan, dengan maksud untuk menemukan unsur-unsurnya kemudian dianalisis bahkan juga diperbandingkan Hasil analisis dengan menggunakan metode Earned Value Analysis terhadap waktu pada proyek Pembangunan Stadion 17 Mei di Banjarmasin :Pekerjaan Proyek Pembangunan Stadion 17 Mei pada minggu pertama sampai kelima mengalami keterlambatan, dilihat dari performa SV yang Negatif (-) dan SPI yang kurang dari 1, namun pada minggu ke 6 sampai dengan minggu ke 12 Proyek Pembangunan Stadion 17 Mei mengalami percepatan pekerjaan, dilihat dari performa SV yang Positif (+) dan SPI lebih dari 1.Perkiraan waktu penyelesaian Proyek Pembangunan Stadion 17 Mei adalah selama ≈19 (18,99) minggu. Ini berarti Proyek Pembangunan Stadion 17 Mei berjalan sesuai jadwal rencana yaitu selama 19 minggu. The methods used to make an estimate of the project implementation plan can be done with the S Curve scheduling method, and Earned Value. For writing this thesis report, the writer tries to discuss the use of the Earned Value method in the May 17 Stadium Development project in Banjarmasin with the S curve scheduling used in the field. As a consideration, the use of the Earned Value scheduling method is certain so that it can be used as a time control tool. Based on the characteristics of the scheduling method with the May 17 Stadium Construction project, there is something in common, namely that each activity must be completed 100% and cannot be done overlapping. The research objective was to determine the time performance evaluation on the 17 May stadium construction project in Banjarmasin The method used in this research is descriptive method. The descriptive method of analysis is done by describing, with the intention of finding the elements and then analyzing them and even comparing them The results of the analysis using the Earned Value Analysis method on the timing of the 17 May Stadium Construction project in Banjarmasin: The work on the 17 May Stadium Construction Project in the first to fifth weeks experienced delays, seen from the negative (-) SV and SPI performance which was less than 1, however from week 6 to week 12 the Stadium Construction Project on May 17 experienced an acceleration of work, seen from the positive performance of SV (+) and SPI of more than 1. Estimated completion time of the 17 May Stadium Construction Project was during ≈19 (18.99) Sunday. This means the May 17th Stadium Construction Project is proceeding according to the planned schedule of 19 weeks.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Evaluasi Kinerja, Proyek Pembangunan Performance Evaluation, Development Projects
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TD Environmental technology. Sanitary engineering
T Technology > TE Highway engineering. Roads and pavements
T Technology > TF Railroad engineering and operation
T Technology > TG Bridge engineering
Depositing User: Elisa Rusida
Date Deposited: 09 Aug 2021 03:58
Last Modified: 09 Aug 2021 03:58
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4575

Actions (login required)

View Item View Item