PERBANDINGAN PERHITUNGAN ANGGARAN BIAYA PEMANCANGAN TIANG PANCANG BETON ANTARA SNI 2008, PERATURAN MENTERI PUPR 2016 DAN BIAYA NYATA DILAPANGAN (Studi Pada Proyek Perkuatan Tebing Sungai Dan Penataan Bantaran Sungai Martapura Kawasan Antasari Kota Banjarmasin)

Rosadi, Muhammad (2021) PERBANDINGAN PERHITUNGAN ANGGARAN BIAYA PEMANCANGAN TIANG PANCANG BETON ANTARA SNI 2008, PERATURAN MENTERI PUPR 2016 DAN BIAYA NYATA DILAPANGAN (Studi Pada Proyek Perkuatan Tebing Sungai Dan Penataan Bantaran Sungai Martapura Kawasan Antasari Kota Banjarmasin). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
Muhammad Rosadi 17640248.pdf

Download (203kB)

Abstract

Pembangunan dalam suatu proyek tidak dapat dicapai dan dilaksanakan dengan mudah karena terkadang masih terdapat kendala, salah satunya faktor biaya. Dalam merencanakan pembangunan sebuah proyek diperlukan sistem perencanaan anggaran biaya, untuk mendapatkan hasil mutu yang baik serta jadwal yang sesuai yang sudah direncanakan. Perhitungan jumlah anggaran biaya yang diperlukan untuk bahan dan upah, serta biaya-biaya lain yang berhubungan dengan pelaksanaan bangunan dalam suatu proyek seperti indeks bahan dan upah yang didapat dari Analisa Harga Satuan Pekerjaan. Metode yang digunakan adalah metode komperatif yaitu membandingkan rencana anggaran biaya berdasarkan analisa SNI 2008, Peraturan Menteri PUPR 2016 dan Biaya Nyata Dilapangan mempelajari buku-buku perpustakaan, serta mengumpulkan informasi dari beberapa pihak yang berpengalaman pada perancangan perencanaan anggaran biaya, serta melakukan pencarian data diantaranya gambar kerja, RAB, daftar harga bahan dan upah daerah penelitian.Hasil perbandingan Perhitungan Anggaran Biaya Pemancangan Tiang Pancang Beton pada Proyek Pekerjaan Pembangunan Perkuatan Tebing Sungai dan Penataan Bantaran Sungai Martapura Kawasan Antasari yaitu pada metode SNI 2008 memerlukan anggaran biaya sebesar Rp. 1.164.481,21,- , pada metode Peraturan Menteri PUPR 2016 memerlukan anggaran biaya sebesar Rp. 1.117.442,35,- dan sedangkan Biaya Nyata Dilapangan Rp. 609.950,00,-. Dari total anggaran biaya tersebut terdapat selisih anggaran biaya sebesar Rp. 531.011,78,- dengan persentase selisih sebesar 46,54 % Development in a project cannot be achieved and implemented easily because sometimes there are still obstacles, one of which is the cost factor. In planning the construction of a project, a budget planning system is needed, to get good quality results and an appropriate schedule that has been planned. Calculation of the amount of the budget required for materials and wages, as well as other costs related to building implementation in a project such as the material index and wages obtained from the Work Unit Price Analysis. The method used is the comparative method, namely comparing the budget plan based on SNI 2008 analysis, 2016 PUPR Ministerial Regulation and Real Cost in the field studying library books, and collecting information from several parties who are experienced in planning budget planning, and conducting data searches including images work, cost estimate, material price list and study area wages.The results of the comparison of the Budget Calculation for Concrete Pile Installation in the River Cliff Strengthening Project and the Arrangement of the Martapura Riverbanks, the Antasari Region, namely the SNI 2008 method requires a budget of Rp. 1,164,481.21, -, in the 2016 PUPR Ministerial Regulation method requires a budget of Rp. 1,117,442.35, - and while the real cost in the field is Rp. 609,950.00, -. From the total budget, there is a difference in the cost budget of Rp. 531,011.78, - with a percentage difference of 46.54%

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Analisa Anggaran Biaya Pemancangan Tiang Pancang Beton, SNI 2008 Peraturan Menteri PUPR 2016 Biaya Nyata Dilapangan Budget Analysis for Concrete Pile Installation, SNI 2008 Ministerial Regulation PUPR 2016 Real Costs in the Field
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Rosadi
Date Deposited: 19 Apr 2021 01:27
Last Modified: 19 Apr 2021 01:27
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4865

Actions (login required)

View Item View Item