PENERAPAN METODE BUILDING INFORMATION MODELING (BIM) PADA STRUKTUR PEMBANGUNAN GEDUNG FKPPI KOTA BANJARMASIN

HIDAYAT, MUHAMMAD RIYAN (2021) PENERAPAN METODE BUILDING INFORMATION MODELING (BIM) PADA STRUKTUR PEMBANGUNAN GEDUNG FKPPI KOTA BANJARMASIN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL SKRIPSI RIYAN-dikonversi.pdf

Download (1MB)

Abstract

Muhammad Riyan Hidayat, 2021 tentang. “PENERAPAN METODE BUILDING INFORMATION MODELING (BIM) PADA STRUKTUR PEMBANGUNAN GEDUNG FKPPI KOTA BANJARMASIN”. Skripsi, Program Studi S-1, Jurusan Teknik Sipil Fakultas Teknik Universitas Islam kalimantan Muhammad Arsyad Al Banjari Banjarmasin. Salah satu infrastruktur yang sedang di bangun yaitu pembangunan dan pengembangan Gedung FKPPI kota Banjarmasin. Building Information Modeling (BIM) untuk membuat dan mengelola data secara akurat dan rinci, dan Structural Analysis Program (Program Analisis Struktur) menyediakan terintegrasi yang lengkap untuk desain struktur baja dan beton bertulang. Untuk mengetahui Analisa struktur dan penerapan BIM teknologi proyek dalam suatu metode yang di teliti. Hasil perhitungan kombinasi pembebanan yang memakai nilai momen terbesar pada balok dan kolom adalah K1 (Kolom type 1) = 1.104,771 kN.m = 110,4771 ton.m, B1 (Balok type 1) = 2.569,455 kN.m = 256,9455 ton.m, dan Balok Anak = 1.041,126 kN.m = 104,1126 ton.m. Hasil perhitungan struktur yang aman dan dapat di realisasikan mengacu pada gambar rencana kerja. Hasil gambar Visualissasi dari pemodelan atau konsep Software Tekla Building Information Modeling (BIM) telah sesuai dengan yang direncanakan. Untuk manajemen konstruksi waktu rencana pembangunan struktur balok, kolom dan pelat lantai yaitu selama 4 minggu kerja. Dari model ini didapatkan volume pekerjaan beton secara total sebesar 109,89 m³, volume pekerjaan pembesian secara total 148.720,7 ton, dan volume total pekerjaan bekisting 774,9 m². Hasil menghitung RAB pekerjaan Sebesar Rp 491.552.904,36,- + PPN (10%) Sebesar Rp 49.155.290,44,- Jumlah perhitungan yang ditambahkan PPN kepekerjaan struktur atas balok, kolom dan pelat lantai dibulatkan sebesar Rp 584.874.100,00,- (Lima Ratus Delapan Puluh Empat Juta Delapan Ratus Tujuh Puluh Empat Ribu Seratus Rupiah). Muhammad Riyan Hidayat, 2021 about. "APPLICATION OF BUILDING INFORMATION MODELING (BIM) METHOD IN THE BUILDING STRUCTURE OF FKPPI BUILDING, BANJARMASIN CITY". Thesis, Undergraduate Study Program, Department of Civil Engineering, Faculty of Engineering, Islamic University of Kalimantan, Muhammad Arsyad Al Banjari Banjarmasin. One of the infrastructures being built is the construction and development of the FKPPI building in Banjarmasin city. Building Information Modeling (BIM) to create accurate and detailed structures and data, and the Structural Analysis Program provides a complete integrated design for steel and reinforced concrete. To see, analyze the structure and application of the BIM technology project in a rigorous method. The result of the calculation of the combination of loading using the greatest moment value on the beam and column is K1 (column type 1) = 1,104,771 kN.m = 110,471 ton.m, B1 (beam type 1) = 2,569,455 kN.m = 256, 9455 tons .m, and Block Children = 1,041,126 kN.m = 104.1126 ton.m. The results of the calculation of the structure that is safe and can be realized refer to the work plan drawing. The results of the visualization image from modeling or the Tekla Building Information Modeling (BIM) Software concept are as planned. For construction management, the planning time for the construction of beams, columns and floor plates is 4 working weeks. From this model, the total volume of concrete works is 109.89 m³, the total volume of ironwork is 148,720.7 tons, and the total volume of formwork works is 774.9 m². The results of calculating the Work Budget of Rp. 491,552,904.36, - + VAT (10%) of Rp. 49,155,290.44 , - (Five Hundred Eighty Four Million Eight Hundred Seventy Four Thousand One Hundred Rupiah).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kombinasi Pembebanan Nilai Momen Terbesar, Gambar Vesualissasi, Konsep Software The combination of the Largest Moment Value Load, Figure Vesualization, Tekla Building Information Modeling (BIM) Software Concept, Total Concrete Work Volume, Work RAB.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Riyan Hidayat
Date Deposited: 26 Apr 2021 04:26
Last Modified: 26 Apr 2021 04:26
URI: http://eprints.uniska-bjm.ac.id/id/eprint/4985