ANALISIS KURVA S DAN CRITICAL PATH METHODE (CPM) DALAM MENGENDALIKAN PROYEK GEDUNG ARSIP KOTA BANJARMASIN

Rizaldy, Muhammad Alif (2021) ANALISIS KURVA S DAN CRITICAL PATH METHODE (CPM) DALAM MENGENDALIKAN PROYEK GEDUNG ARSIP KOTA BANJARMASIN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL MUHAMMAD ALIF RIZALDY 16640078.pdf

Download (363kB)

Abstract

Pembangunan Gedung Arsip kota Banjarmasin mengalami keterlambatan dalam progress pembangunannya sehingga di perlukan analisis Critical Path Methode (CPM) dan Kurva S untuk mengevaluasi percepatan proyek agar sesuai time schedule yang direncanakan. Tujuan penelitian ini adalah untuk menganalisis realisasi proyek yang telah direncanakan dengan menggunakan metode kurva S dan untuk mengevaluasi pengendalian pekerjaan yang terlambat dengan menggunakan Critical Path Methode (CPM) . Metode penelitian ini yaitu dengan cara menganalisis progres proyek dengan menggunakan kurva S dan Critical Path Methode (CPM) sehingga diketahui evaluasi agar proyek dapat berjalan sesuai dengan rencana. Hasil penelitian menunjukkan bahwa analisis dari Jadwal yang telah direncanakan dengan menggunakan metode kurva S didapatkan bahwa realisasi pelaksanaan pembangunan gedung Arsip Kota Banjarmasin belum sesuai rencana. Ditinjau dari segi waktu mengalami keterlambatan sebesar 14 hari (9,3%) dari rencana 24 minggu (165 hari) menjadi 26 minggu (189 hari), sedangkan biaya realisasi penggunaan dana sampai minggu 24 sebesar Rp.8.599.126.653,81,- atau sesuai dengan jumlah biaya yang direncanakan dan untuk mengatasi sisa pekerjaan yang terlambat dilakukan evaluasi pengendalian pekerjaan dengan menggunakan Critical Path Methode (CPM) diperoleh 3 lintasan kritis, yaitu sanitasi & instalasi air, Pengecatan dan site development dengan hasil setelah dilakukan penjadwalan ulang dan menggunakan percepatan diperoleh waktu optimum 22 minggu dari waktu rencana 24 minggu, dengan peningkatan biaya Rp.10.313.171,- untuk menambah jam lembur pekerja dan peningkatan sebesar Rp 22.367.682,- untuk menambah jumlah pekerja. S CURVE ANALYSIS AND CRITICAL PATH METHODE (CPM) METHODE IN CONTROL OF ARCHIVE BUILDING BANJARMASIN CITY Compiled by: M. Alif Rizaldy, Advisor I: Adhi Surya, ST., MT., Advisor II: Hendra Cahyadi, ST, MT The construction of the Banjarmasin City Archives Building is experiencing delays in the progress of its construction so a Critical Path Methode (CPM) and S Curve analysis is needed to evaluate the acceleration of the project to fit the planned time schedule. The purpose of this study is to analyze the planned project realization using the S curve Methode and to evaluate the control of late work using the Critical Path Methode (CPM) Methode. This research Methode is by analyzing the progress of the project using the S curve and the Critical Path Methode (CPM) so that evaluation is known so that the project can proceed according to plan. The results showed that the analysis of the planned schedule using the S curve Methode was found that the realization of the construction of the Banjarmasin City Archives building was not according to plan. In terms of time, they experienced a delay of 14 days (9.3%) from the planned 24 weeks (165 days) to 26 weeks (189 days), while the actual cost of using the funds up to week 24 was Rp.8,599,126,653.81, or in accordance with the planned amount of costs and to overcome the remaining work that was late to do an evaluation of work control using the Critical Path Methode (CPM) Methode obtained 3 critical paths, namely sanitation & water installation, Painting and site development with the results after rescheduling and using acceleration an optimum time of 22 weeks is obtained from the planned 24-week time, with an increase in cost of Rp. . 10,313,171, - to increase overtime hours of workers and an increase of Rp. 22,367,682, - to increase the number of workers.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kurva S, Critical Path Methode (CPM) pengendalian proyeksi S curve, Critical Path Methode (CPM) projection control
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Alif Rizaldy
Date Deposited: 11 Nov 2021 02:33
Last Modified: 11 Nov 2021 02:33
URI: http://eprints.uniska-bjm.ac.id/id/eprint/8861

Actions (login required)

View Item View Item