ANALISA RENCANA ANGGARAN BIAYA ANTARA BOW, SNI DAN RILL RENOVASI GUDANG BULOG KABUPATEN KOTABARU KALIMANTAN SELATAN

ANUGRAH, MUHAMMAD (2020) ANALISA RENCANA ANGGARAN BIAYA ANTARA BOW, SNI DAN RILL RENOVASI GUDANG BULOG KABUPATEN KOTABARU KALIMANTAN SELATAN. Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
JURNAL MUHAMMAD ANUGERAH(1)-min.pdf

Download (284kB)

Abstract

Dalam sebuah proyek konstruksi, perkiraan biaya memang penting dalamperanan pelaksanaanproyek. Untuk meninggkatkan efisiensi dan efektifitas kegiatan pembangunan gedung dan bangunan dibidang konstruksi, diperlukan suatu sarana dasar perhitungan harga satuan yaitu Analisa Biayakonstruksi. Kontrakttor umumnya membuat harga penawaran berdasarkan analisa yang idak seluruhnya berprdoman pada analisa BOW(Burgrlijke Openbare Werken) maupun analisa SNI (Standarisasi Nasional Indonesia). Para kontarktor lebih cenderung menghitung harga satuan pekerjaan berdasarkan dengan analisa mereka sendiri dan harga RILL yang di dasarkan atas pengalaman terdahulu dalam menyelesaikan suatupekerjaan konstruksi, walupun tidak terlepas dari analisa BOW dan SNI Metode penelitian dalam melaksnakan analisa Rencana Anggaran Biaya (RAB) yaitu dengan BOW, SNI dan Metode RIIL. Dari perhitungan masing-masing analisa rencana anggaran biaya yang ada, didapat perbandingan rencana anggaran biaya antara metode BOW, SNI dan Metode RILL. Rencana anggaran biaya yang ekonomis dengan menggunakan Metode BOW yaitu sebesar Rp. 2.595.664.000,- Sementar hasil analisa rencana anggaran biaya SNI yaitu sebesar Rp 2.305.611.000,-sedangkan analisa rencana anggaran biaya RILL yaitu sebesar Rp. 2.177.739 In a construction project, the estimated cost is indeed an important role in the implementation of the project. To increase the efficiency and effectiveness of building and building construction activities in the field of construction, we need a basic means of unit price calculation, namely Analysis of Construction Costs. Contractors generally make bid prices based on an analysis that is not entirely predominant in the BOW (Burgrlijke Openbare Werken) analysis or SNI (Indonesian National Standardization) analysis. The contractor is more likely to calculate the price of the work unit based on their own analysis and the price of RILL based on previous experience in completing a construction work, even though it is inseparable from the analysis of BOW and SNI The research method in analyzing the Budget Plan (RAB) is BOW, SNI and RIIL Method. From the calculation of each existing budget plan analysis, a comparison of the cost budget plan is obtained between the BOW, SNI and RILL methods. An economical cost budget plan using the BOW Method that is Rp. 2,595,664,000, - While the analysis of the SNI cost budget plan is Rp 2,305,611,000, - while the RILL cost budget plan analysis is Rp. 2,177,739.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: RAB, BOW, SNI, RILL
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Muhammad Anugrah
Date Deposited: 16 Sep 2020 02:09
Last Modified: 16 Sep 2020 02:09
URI: http://eprints.uniska-bjm.ac.id/id/eprint/2020