ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMBESIAN PLAT LANTAI DENGAN METODE WORK SAMPLING (Study Empiris Proyek Gedung Negara Kantor Wilayah Badan Pertanahan Nasional Provinsi Kalimantan Selatan)

Wijanarko, Dimas Roykyu (2022) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMBESIAN PLAT LANTAI DENGAN METODE WORK SAMPLING (Study Empiris Proyek Gedung Negara Kantor Wilayah Badan Pertanahan Nasional Provinsi Kalimantan Selatan). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ARTIKEL DIMAS.pdf

Download (710kB)

Abstract

Produktivitas tenaga kerja merupakan salah satu faktor penentu keberhasilan suatu proyek konstruksi. Ada berbagai cara untuk mengukur tingkat produktivitas, salah satunya adalah penelitian tingkat LUF (Labor Utilation Factor) dengan metode work sampling dimana pekerja dikelompokkan berdasarkan aktivitas kerja. Penelitian dengan observasi dalam waktu satu siklus kerja. Tujuan dari penelitian ini adalah untuk mengetahui tingkat produktivitas. Penelitian ini dilakukan di proyek pembangunan badan pertanahan nasional yang dilakukan dengan mengamati aktivitas pekerja. Dari hasil data tersebut dilakukan pengolahan data untuk mendapatkan nilai LUF (Labor Utilation Factor). Hasil penelitian adalah nilai LUF (Labor Utilization Factor) kelompok pekerja pada tahap pemasangan plat lantai besi yaitu sebesar 62,41%. Tunjukkan bahwa (produktivitas) pekerja pada tahap pemasangan plat lantai besi masih efektif, karena nilai LUF melebihi 50% Labor productivity is one of the determining factors for the success of a construction project. There are various ways to measure the level of productivity, one of which is the LUF (Labor Utilization Factor) level research with the work sampling method where workers are grouped based on work activities. Research with observation within one work cycle. The purpose of this study was to determine the level of productivity. This research was conducted in a national land agency development project which was carried out by observing the activities of workers. From the results of the data, data processing is carried out to obtain the LUF (Labor Utilization Factor) value. The results of the study were the LUF (Labor Utilization Factor) value of the worker group at the stage of installing the iron floor plate, which was 62.41%. Show that the (productivity) of workers at the stage of installing the iron floor plate is still effective, because the LUF value exceeds 50%

Item Type: Thesis (Diploma)
Uncontrolled Keywords: tenaga kerja,proyek,plat lantai labor, project, floor plate
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Depositing User: Dimas Roykyu Wijanarko
Date Deposited: 24 Aug 2022 05:16
Last Modified: 24 Aug 2022 05:16
URI: http://eprints.uniska-bjm.ac.id/id/eprint/12164

Actions (login required)

View Item View Item