ANALISIS PRODUKTIVITAS, BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT EXCAVATOR DAN DUMP TRUCK PADA PEKERJAAN GALIAN TANAH (STUDI KASUS : PROYEK PENGGANTIAN JEMBATAN SUNGAI BERANGAS)

FITRI, IDA (2020) ANALISIS PRODUKTIVITAS, BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT EXCAVATOR DAN DUMP TRUCK PADA PEKERJAAN GALIAN TANAH (STUDI KASUS : PROYEK PENGGANTIAN JEMBATAN SUNGAI BERANGAS). Diploma thesis, Universitas Islam Kalimantan MAB.

[img] Text
ida fitri.pdf

Download (285kB)

Abstract

Produktivitas adalah kemampuan produksi suatua alat berat dengan satua meter kubik per jam. Pada penelitian ini merupakan penelitian untuk galian tanah yang menggunakan alat berat dan pengangkutan tanah menggunakan alat berat. Produkivitas alat berat dipengaruhi oleh kapasitas bucket alat berat, kondisi kerja dan waktu siklus. Pada penelitian ini dilaksanakan pada proyek penggantian jembatan Sungai Berangas di jalan Handil Bakti, Barito Kuala, Kalimantan Selatan. Dengan menggunakan alat berat excavator untuk menggali dan dump truck untuk mengangkut tanah yang sudah digali. Tujuan dari penelitian ini untuk mengetahui produksi alat berat, besar biaya operasioanl yang diperlukan oleh alat berat, waktu pengerjaakn pekerjaan galian dan faktor-faktor yang mempengaruhi produksi alat berat. Hasil dari penelitian ini adalah dengan volume total galian 618,34 m3 didapat produksi alat berat excavator per jam sebesar 44,64 m3/jam. Dan produksi alat berat dump truck didapat sebesar 6,68 m3/jam. Dengan total biaya operasional kedua alat berat tersebut sebesar Rp.21.558.O46,- dengan jumlah 1 unit excavator dan 7 unit dump truck. Waktu kerja excavator selama 13,85 jam dan waktu kerja dump truck selama 1O9,22 jam. Productivity is the ability to produce a machine with one cubic meter per hour. This research is a research for soil excavation using heavy equipment and soil transportation using heavy equipment. Machine productivity is built on machine bucket capacity, working conditions and cycle times.This research was carried out in the Berangas River bridge replacement project on Handil Bakti Street, Barito Kuala, South Kalimantan. By using heavy equipment excavators to find and dispose of trucks to transport the excavated land. The purpose of this research is to see the production of heavy equipment, the amount of operating costs required by the heavy equipment, the working time, and the factors that affect the heavy equipment. The result of this research is that with the total excavation volume of 618.34 m3, the production of excavator heavy equipment per hour is 44.64 m3 / hour. And the production of heavy dump truck equipment is 6.68 m3 / hour. With a total operational cost of the two heavy equipment of Rp. 21,558,O46, - with a total of 1 excavator and 7 dump trucks. The excavator working time is 13.85 hours and the dump truck working time is 1O9.22 hours.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Produktivitas, biaya operasional, waktu, excavator, dump truck, Proyek Penggantian Jembatan Berangas Handil Bakti. Productivity, operational costs, time, excavator, dump truck, Replacement Project Of River River Bridge
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Depositing User: Ida Fitri
Date Deposited: 14 Sep 2020 02:02
Last Modified: 14 Sep 2020 02:02
URI: http://eprints.uniska-bjm.ac.id/id/eprint/2075