Saputri, Amalia (2024) ANALISIS CASH FLOW PADA PROYEK PEMBANGUNAN BAHU JALAN KOLONEL SOEPIRMAN KEC. PELAIHARI. Diploma thesis, Universitas Islam Kalimantan MAB.
|
Text
Abstrak amalia.pdf Download (14kB) |
|
|
Text
Lembar Keaslian Skripsi amalia.pdf Download (204kB) |
|
|
Text
Lembar Pengesahan Skripsi amalia.pdf Download (331kB) |
Abstract
ABSTRAK Pelaksanaan proyek konstruksi memerlukan banyak sumber daya diantaranya adalah peralatan, tenaga kerja, material, dan finansial. Tujuannya adalah untuk mengetahui sistem pembayaran yang baik, besar keuntungan dan faktor-faktor yang mempengaruhi cash flow, maka dilakukan penelitian pada Proyek Pembangunan Bahu Jalan Kolonel Soepirman Kec. Pelaihari.Metode yang digunakan yaitu membuat diagram jaringan proyek dengan PDM dengan menggunakan bantuan software Microsoft Project. Kemudian dilakukan perhitungan cash flow dengan beberapa sistem pembayaran yaitu pembayaran bulanan dan pembayaran termin tanpa uang muka dan dengan uang muka 20%, 25%, 30%. Dari hasil perhitungan dapat diketahui cash flow proyek yang paling optimal yang dapat memberikan profit yang paling besar bagi kontraktor dan faktor-faktor yang mempengaruhi cash flow pada proyek.Hasil analisis data menghasilkan bahwa pada Proyek Pembangunan Bahu Jalan Kolonel Soepirman Kec. Pelaihari dengan sistem pembayaran bulanan dengan uang muka 30% menghasilkan keuntungan profit sebesar 10,43% dari nilai kontrak. Sedangkan sistem pembayaran yang memberikan profit maksimum adalah sistem pembayaran bulanan dengan uang muka 20% pada kondisi LST menghasilkan profit sebesar 10,58% dari nilai kontrak. Kata Kunci: Cash Flow, Sistem Pembayaran, PDM, Profit ABSTRACT The implementation of construction projects requires a lot of resources including equipment, labor, materials, and finance. The aim is to find out a good payment system, the amount of profit and the factors that affect cash flow, then the research was carried out on the Roadside Construction Kolonel Soepirman Project, Kec. Pelaihari. The method used is to make a project network diagram with PDM using Microsoft Project software. Then do the calculation of cash flow with several payment systems, namely monthly payments and payment terms without a down payment and with a down payment of 20%, 25%, 30%. Based on the calculation results, it can be seen that the most optimal project cash flow can provide the greatest profit for contractors and the factors that affect project cash flow.The results of the data analysis resulted that in the Roadside Construction Kolonel Soepirman Project, Kec.Pelaihari with a monthly payment system with a down payment of 30% generate a profit of 10.43% of the contract value. Meanwhile, the payment system that provides maximum profit is a monthly payment system with a down payment of 20% in LST conditions resulting in a profit of 10.58% of the contract value. Keywords: Cash Flow, Payment System, PDM, Profit
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Cash Flow, Sistem Pembayaran, PDM, Profit |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | Amalia Saputri |
| Date Deposited: | 20 Jun 2024 02:15 |
| Last Modified: | 20 Jun 2024 02:15 |
| URI: | http://eprints.uniska-bjm.ac.id/id/eprint/23944 |
Actions (login required)
![]() |
View Item |