Tamia, Resty (2026) ANALISIS KETERLAMBATAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG KANTOR KELURAHAN BARABAI UTARA. Diploma thesis, universitas islam Kalimantan MAB.
|
Text
File pdf abstrak.pdf Download (226kB) |
|
|
Text
PERNYATAAN KEASLIAN SKRIPSI.pdf Download (4MB) |
|
|
Text
LEMBAR PENGESAHAN.pdf Download (5MB) |
Abstract
ABSTRAK Keterlambatan waktu dalam pelaksanaan proyek konstruksi merupakan salah satu permasalahan utama yang sering terjadi dan dapat memengaruhi keberhasilan suatu proyek. Penelitian ini menganalisis faktor-faktor penyebab keterlambatan pada pembangunan gedung kantor Kelurahan Barabai Utara menggunakan analisis statistik dengan SPSS. Data diperoleh melalui kuesioner yang disebarkan kepada kontraktor, konsultan, dan pemilik proyek. Hasil penelitian menunjukan bahwa faktor-faktor utama yang memengaruhi keterlambatan proyek meliputi, cuaca buruk (hujan deras/ lokasi tergenang), kondisi dan lingkungan tapak ternyata tidak sesuai dengan dugaan, kerjasama kurang optimal, kekurangan tenaga kerja, dan produktivitas tidak optimal oleh kontraktor. Analisis regresi menggunakan SPSS menunjukan hubungan signifikan antara faktor-faktor tersebut dengan keterlambatan proyek. Penelitian ini memberikan rekomendasi berupa penerapan manajemen proyek yang lebih baik, peningkatan komunikasi antar pihak, serta perencanaan yang lebih matang untuk meminimalkan resiko keterlambatan. Hasil penelitian ini diharapkan dapat menjadi acuan bagi pihak-pihak yang terlibat dalam proyek konstruksi serupa untuk meningkatkan efesiensi dan efektivitas pelaksanaan proyek. ABSTRACT Time delays in the implementation of construction projects are one of the main issues that frequently occur and can affect the success of a project. This study analyzes the factors causing delays in the construction project of the North Barabai Village Office building using statistical analysis with SPSS. Data were collected through questionnaires distributed to contractors, consultants, and project owners. The results show that the main factors affecting project delays include severe weather (heavy rain/flooded site), site conditions and environment that were not as expected, suboptimal collaboration, labor shortages, and low contractor productivity. Regression analysis using SPSS indicated a significant relationship between these factors and project delays. This study provides recommendations for better project management implementation, improved communication between parties, and more thorough planning to minimize the risk of delays. The results of this study are expected to serve as a reference for stakeholders in similar construction projects to enhance efficiency and effectiveness in project implementation.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Kata kunci: keterlambatan proyek, konstruksi, SPSS, manajemen waktu, gedung kantor |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | Resty Tamia |
| Date Deposited: | 24 Jun 2026 02:34 |
| Last Modified: | 24 Jun 2026 02:34 |
| URI: | http://eprints.uniska-bjm.ac.id/id/eprint/36263 |